| 604896 |
ARLINGTON- BELMONT- CAMBRIDGE- LEXINGTON- LINCOLN- SIGN REPLACEMENT & IMPROVEMENTS ON STATE ROUTE 2 |
Sign Installation/Upgrading |
CONSTRUCTION |
|
| 605259 |
ARLINGTON- BELMONT- CAMBRIDGE- RESURFACING & RELATED WORK ON ROUTE 2 |
Resurfacing |
CONSTRUCTION |
|
| 604687 |
ARLINGTON- RECONSTRUCTION OF MASSACHUSETTS AVENUE, FROM POND STREET TO THE CAMBRIDGE C.L. |
Hwy. Reconstr - Minor Widening |
DESIGN |
2012 |
| 605520 |
ARLINGTON- DECK & SUBSTRUCTURE REPAIRS, A-10-014, MYSTIC VALLEY PARKWAY OVER ALEWIFE BROOK |
Structures Maintenance |
DESIGN |
|
| 605672 |
ARLINGTON- CAMBRIDGE- SOMERVILLE- ALEWIFE GREENWAY CORRIDOR RESTORATION (AKA MINUTEMAN BIKE PATH CONNECTOR) |
Bikeway/Bike Path Construction |
DESIGN |
2010 |
| 605748 |
ARLINGTON- RECONSTRUCTION ON FOREST STREET, FROM WINCHESTER T.L. TO SUMMER STREET |
Hwy Reconstr-No Added Capacity |
DESIGN |
|
| 605794 |
ARLINGTON- SAFE ROUTES TO SCHOOL (DALLIN SCHOOL) |
Hwy. Reconstr - Minor Widening |
DESIGN |
|
| 600462 |
ARLINGTON- BRIDGE REPLACEMENT, BR# A-10-011 ROUTE 2 OVER THE MINUTEMAN BIKEWAY |
Bridge Replacement |
COMPLETE |
|
| 602286 |
ARLINGTON- ROADWAY RECONSTRUCTION ON A SECTION OF ROUTE 2A (SUMMER STREET) |
Hwy. Reconstr - Minor Widening |
COMPLETE |
|
| 602915 |
DISTRICT 4- RESURFACING AND RELATED WORK IN AREA "B" |
Resurfacing |
COMPLETE |
|