City/Town Information
City:
District: 5
County: BARNSTABLE
City or Town: TOWN
Projects
Filter projects by: Project Phase TIP Status
All Projects All Projects
Construction Current Fiscal Year
Design Future Years
Complete Not Programmed
Number Description Project Type Status TIP Year
601441 BARNSTABLE- RECONSTRUCTION ON ROUTE 132 (2 LANES TO 4 LANES) FROM ROUTE 6 TO BEARSE'S WAY (2 MILES) Safety Improvements CONSTRUCTION
604096 BARNSTABLE- SIGNAL & INTERSECTION IMPROVEMENTS ON ROUTE 28 @ 3 LOCATIONS: LUMBERT MILLS ROAD, SOUTH COUNTY ROAD AND ROUTE 149 Traffic Signals CONSTRUCTION
604521 BARNSTABLE- RESURFACING AND RELATED WORK ON ROUTE 6A Resurfacing CONSTRUCTION
604544 BARNSTABLE- PEDESTRIAN LIGHTING UPGRADES, CAPE COD GATEWAY (MAIN STREET HYANNIS) Lighting and Electrical CONSTRUCTION
601102 BARNSTABLE- RESURFACING AND RELATED WORK ON ROUTE 28 (FROM YARMOUTH TL TO HYANNIS ROTARY) Resurfacing DESIGN
602476 BARNSTABLE- RECONSTRUCTION OF YARMOUTH ROAD, FROM STATE ROUTE 28 AT YARMOUTH ROAD TO YARMOUTH T.L (APPROX 2.1 KM) Hwy Reconstr - Added Capacity DESIGN
602797 BARNSTABLE- RECONSTRUCTION OF ROUTE 28, FROM 200 M WEST OF OLD STRAWBERRY HILL ROAD TO PHINNEY'S LANE (1.8 KM) Hwy Reconstr-No Added Capacity DESIGN
602802 BARNSTABLE- RECONSTRUCTION ON ROUTE 28, FROM AIRPORT ROTARY WEST TO 200 M + WEST OF OLD STRAWBERRY HILL ROAD (APPROX. 2.8 KM) Hwy Reconstr - Added Capacity DESIGN
604093 BARNSTABLE- SIGNAL & INTERSECTION IMPROVEMENTS AT ROUTE 149 & ROUTE 6 Hwy Reconstr-No Added Capacity DESIGN 2010
604914 BARNSTABLE- LANDSCAPING & IMPROVEMENTS ON ROUTE 132, FROM ROUTE 6 TO BEARSE'S WAY Landscape and Roadside Develop DESIGN
605272 BARNSTABLE- BRIDGE PRESERVATION, B-01-019, ROUTE 6 OVER IYANQUGH ROAD (ROUTE 132) Structures Maintenance DESIGN
105701 BARNSTABLE- RESURFACING AND RELATED WORK ON A SECTION OF ROUTE 28 (FALMOUTH ROAD) Resurfacing COMPLETE
600966 BARNSTABLE- BRIDGE REPLACEMENT, BR# B-01-002 CRAIGVILLE BEACH ROAD OVER CENTERVILLE RIVER Bridge Replacement COMPLETE
600967 BARNSTABLE- MASHPEE- BRIDGE REPLACEMENT, BR# B-01-006=M-08-001 SCHOOL STREET OVER SANTUIT RIVER Bridge Replacement COMPLETE
601396 BARNSTABLE- ROADWAY RECONSTRUCTION INCLUDING TRAFFIC SIGNALS ON A SECTION OF ROUTE 28 (FALMOUTH ROAD) Safety Improvements COMPLETE
601916 BARNSTABLE- RECLAMATION OF BEARSE'S WAY FROM ROUTE 28 NORTH TO PITCHER'S WAY (4,300 FEET) Hwy Reconstr-No Added Capacity COMPLETE
603427 BARNSTABLE- RESURFACING AND RELATED WORK ON ROUTE 6 FROM SANDWICH/BARNSTABLE T.L. TO BARNSTABLE/YARMOUTH T.L. (13,630 METERS) Resurfacing COMPLETE