City/Town Information
City:
District: 1
County: FRANKLIN
City or Town: TOWN
Projects
Filter projects by: Project Phase TIP Status
All Projects All Projects
Construction Current Fiscal Year
Design Future Years
Complete Not Programmed
Number Description Project Type Status TIP Year
602316 BUCKLAND- CHARLEMONT- RESURFACING AND RELATED WORK ON ROUTE 2, FROM MM 27.45 TO MM 37.41 Resurfacing DESIGN 2012
603280 BUCKLAND- BRIDGE REPLACEMENT, B-28-002, ROUTE 112 (ASHFIELD ROAD) OVER CLARKS BROOK Bridge Replacement DESIGN 2011
604268 BUCKLAND- RECONSTRUCTION OF STATE STREET, FROM CLEMENT STREET TO ROUTE 2 Hwy Reconstr - Restr and Rehab DESIGN 2010
605453 BUCKLAND- SHELBURNE- BRIDGE BETTERMENT, B-28-032=S-11-014, ROUTE 2 OVER ROUTE 112 & DEERFIELD RIVER Structures Maintenance DESIGN
605882 BUCKLAND-SHELBURNE- BRIDGE PRESERVATION, B-28-022=S-11-001, ROUTE 2A (BRIDGE STREET) OVER DEERFIELD RIVER Bridge Reconstruction/Rehab DESIGN
81106 BUCKLAND- BRIDGE REPLACEMENT, BR# B-28-003 ROUTE 112 (CONNECTOR ROAD) OVER B & M RAILROAD AND ROUTE 2 Bridge Replacement COMPLETE
601750 BUCKLAND- SHELBURNE- CLEANING AND PAINTING STEEL BRIDGE, BR# B-28-022=S-11-001 ROUTE 2A (BRIDGE STREET) OVER THE DEERFIELD RIVER Painting - Structural COMPLETE
602232 BUCKLAND- BRIDGE REPLACEMENT, BR# B-28-006, ROUTE 112 (ASHFIELD ROAD) OVER CLESSON BROOK Bridge Replacement COMPLETE
602425 DISTRICT 1- REPAIR OF 19 CHEMICAL STORAGE SHEDS AT VARIOUS LOCATIONS. Chemical Storage Sheds COMPLETE
602441 BUCKLAND- BRIDGE REPLACEMENT, BR# B-28-011, UPPER STREET OVER THE CLESSON BROOK Bridge Reconstruction/Rehab COMPLETE
602954 BUCKLAND- SHELBURNE- SHELBURNE FALLS DOWNTOWN STREETSCAPE PROJECT Lighting and Electrical COMPLETE
603173 BUCKLAND- BRIDGE REPLACEMENT, BR# B-28-012 HOG HOLLOW ROAD OVER CLESSON BROOK Bridge Replacement COMPLETE
603752 BUCKLAND- CONSTRUCTION OF A PRE-ENGINEERED STEEL STORAGE FACILITY AT MHD MAINTENANCE DEPOT ON ROUTE 2 Vertical Construction (Ch 149) COMPLETE