City/Town Information
City:
District: 4
County: MIDDLESEX
City or Town: CITY
Projects
Filter projects by: Project Phase TIP Status
All Projects All Projects
Construction Current Fiscal Year
Design Future Years
Complete Not Programmed
Number Description Project Type Status TIP Year
600811 CAMBRIDGE- SOMERVILLE- BELMONT- BIKEWAY CONSTRUCTION AT ALEWIFE STATION, INCLUDES PEDESTRIAN BRIDGE Bikeway/Bike Path Construction CONSTRUCTION
604896 ARLINGTON- BELMONT- CAMBRIDGE- LEXINGTON- LINCOLN- SIGN REPLACEMENT & IMPROVEMENTS ON STATE ROUTE 2 Sign Installation/Upgrading CONSTRUCTION
605259 ARLINGTON- BELMONT- CAMBRIDGE- RESURFACING & RELATED WORK ON ROUTE 2 Resurfacing CONSTRUCTION
605656 CAMBRIDGE- NEWTON- FIBER OPTIC CONNECTION AT THREE LOCATIONS (ITS) Intelligent Transportation Sys CONSTRUCTION
605726 BOSTON- CAMBRIDGE- NORTH BANK BRIDGE CONSTRUCTION, B-16-302=C-01-028, RIVERWALK OVER MBTA New Bridge CONSTRUCTION
604361 BOSTON- CAMBRIDGE- BRIDGE REHABILITATION, B-16-009=C-01-002, CAMBRIDGE STREET OVER THE CHARLES RIVER (MEMORIAL DRIVE & STORROW DRIVE) (AKA - LONGFELLOW BRIDGE) Bridge Reconstruction/Rehab DESIGN 2010
604421 BOSTON- CAMBRIDGE- BRIDGE REHABILITATION, B-16-009=C-01-002, CAMBRIDGE STREET OVER THE CHARLES RIVER (MEMORIAL & STORROW DRIVE) (AKA - LONGFELLOW BRIDGE) *EARLY ACTION - PHASE 1* Bridge Reconstruction/Rehab DESIGN 2010
604685 BOSTON- CAMBRIDGE- DAM BRIDGE REHABILITATION, B-16-013=C-01-019, CHARLES RIVER DAM ROAD (STATE ROUTE 28) OVER THE CHARLES RIVER (CRAIGIE BRIDGE) AND DRAWBRIDGE REHABILITATION (CRAIGIE DRAWBRIDGE, FORMERLY PROJECT NO. 605530) Bridge Reconstruction/Rehab DESIGN
604911 CAMBRIDGE- INTERSECTION IMPROVEMENTS AT 7 INTERSECTIONS ON ROUTE 28 (MONSIGNOR O'BRIEN HIGHWAY) Hwy Reconstr - Restr and Rehab DESIGN
604993 CAMBRIDGE- INNOVATION BOULEVARD STREETSCAPE & PEDESTRIAN IMPROVEMENTS, BETWEEN MAIN STREET & BINNEY STREET (PHASE I) Hwy Reconstr - Restr and Rehab DESIGN
605188 CAMBRIDGE- CAMBRIDGE COMMON IMPROVEMENTS AT WATERHOUSE STREET/MASS AVE/GARDEN STREET Hwy Reconstr - Restr and Rehab DESIGN 2013
605637 CAMBRIDGE- IMPROVEMENTS AT ROUTE 2 & ROUTE 16 Hwy. Reconstr - Minor Widening DESIGN
605672 ARLINGTON- CAMBRIDGE- SOMERVILLE- ALEWIFE GREENWAY CORRIDOR RESTORATION (AKA MINUTEMAN BIKE PATH CONNECTOR) Bikeway/Bike Path Construction DESIGN 2010
605684 CAMBRIDGE- INTERSECTION & SIGNAL IMPROVEMENTS ON BROADWAY, FROM THIRD STREET TO AMES STREET (KENDALL SQUARE) Hwy Reconstr - Restr and Rehab DESIGN 2011
160065 CAMBRIDGE- BRIDGE REPLACEMENT, BR# C-01-013, WALDEN STREET OVER THE B & M RAILROAD AND MBTA Bridge Replacement COMPLETE
600300 CAMBRIDGE- ROADWAY RECONSTRUCTION ON A SECTION OF MASSACHUSETTS AVENUE AND LAFAYETTE SQUARE Hwy Reconstr-No Added Capacity COMPLETE
601807 BOSTON- CAMBRIDGE- MEDFORD- SOMERVILLE- INSTALLATION OF TRAFFIC SURVEILLANCE AND CONTROL EQUIPMENT ON I-93 Miscellaneous/No Prequal COMPLETE
602594 CAMBRIDGE- CAMBRIDGEPORT ROADWAYS IMPROVEMENT PROJECT Hwy Reconstr - Added Capacity COMPLETE