| 603142 |
AMESBURY- RESURFACING & SIDEWALK CONSTRUCTION ON ROUTE 110, FROM ROUTE 150 TO ROUTE I-495 (1.6 KM) |
Resurfacing |
CONSTRUCTION |
|
| 604586 |
HAVERHILL- MERRIMAC- AMESBURY- SALISBURY- INTERSTATE MAINTENANCE & RELATED WORK ON I-495 |
Resurfacing |
CONSTRUCTION |
|
| 180509 |
AMESBURY- SALISBURY- RECONSTRUCTION OF STATE ROUTE 110, FROM ROUTE I-495 TO MERRILL STREET |
Hwy. Reconstr - Minor Widening |
DESIGN |
2010 |
| 601096 |
AMESBURY- NEWBURYPORT- SALISBURY - BRIDGE REPLACEMENTS ON ROUTE I-95, A-07-016=N-11-007, OVER MERRIMACK RIVER (WHITTIER BRIDGE) & A-07-017 OVER EVANS PLACE |
Bridge Replacement |
DESIGN |
2012 |
| 602033 |
AMESBURY- RECONSTRUCTION OF ROUTE 150 |
Hwy Reconstr-No Added Capacity |
DESIGN |
|
| 602321 |
AMESBURY- BRIDGE REPLACEMENT, A-07-015, R STREET OVER THE BACK RIVER |
Bridge Replacement |
DESIGN |
2010 |
| 602322 |
AMESBURY- BRIDGE REPLACEMENT, A-07-008, OAK STREET OVER THE B&M RAILROAD (ABANDONED LINE) |
Bridge Replacement |
DESIGN |
|
| 602418 |
AMESBURY- RECONSTRUCTION OF ELM STREET |
Hwy Reconstr-No Added Capacity |
DESIGN |
|
| 603183 |
AMESBURY- BRIDGE REPLACEMENT, A-07-010, MAIN STREET OVER MERRIMACK RIVER (1ST LT. DEREK S. HINES MEMORIAL BRIDGE) |
Bridge Replacement |
DESIGN |
|
| 603682 |
AMESBURY- BRIDGE REPLACEMENT, A-07-026, ROUTE I-495 (NB & SB) OVER THE BIKEWAY (ABANDONED B&M RR LINE) |
Bridge Replacement |
DESIGN |
|
| 604025 |
DISTRICT 4- GRASS MOWING AND TRIMMING OF STATE HIGHWAYS (AREA 4D-1) |
Mowing and Spraying |
DESIGN |
|
| 604026 |
DISTRICT 4- GRASS MOWING AND TRIMMING OF STATE HIGHWAYS (AREA 4D-2) |
Mowing and Spraying |
DESIGN |
|
| 600634 |
AMESBURY- BRIDGE REPLACEMENT, BR# A-07-007 CLINTON STREET OVER THE BACK RIVER |
Bridge Replacement |
COMPLETE |
|
| 600931 |
AMESBURY- ROADWAY RECONSTRUCTION ON A SECTION OF MAIN STREET |
Hwy Reconstr - Added Capacity |
COMPLETE |
|
| 601277 |
AMESBURY- NEWBURYPORT- BRIDGE REHABILITATION, A-07-014=N-11-010, MAIN STREET OVER THE MERRIMACK RIVER (CHAIN BRIDGE) |
Bridge Reconstruction/Rehab |
COMPLETE |
|
| 602323 |
AMESBURY- BRIDGE REPLACEMENT, BR# A-07-004 THOMPSON STREET OVER THE POWWOW RIVER |
Bridge Replacement |
COMPLETE |
|
| 602342 |
AMESBURY- CONSTRUCTION OF POWWOW RIVERWALK & BIKEPATH (PHASE II) FROM MARKET SQ. TO ROCKY HILL RD. INCLUDING BR# A-07-034 |
Bikeway/Bike Path Construction |
COMPLETE |
|
| 602343 |
AMESBURY- POWWOW RIVERWALK CONSTRUCTION, FROM MAIN STREET TO WATER STREET, INCLUDES PED BRIDGE A-07-034 (PHASE I) |
Bikeway/Bike Path Construction |
COMPLETE |
2012 |
| 602727 |
DISTRICT 4- SCHEDULED AND EMERGENCY REPAIRS TO DRAWBRIDGES IN NORTH AREA (3 SEPARATE CONTRACTS) |
Drawbridge Maintenance |
COMPLETE |
|
| 603785 |
AMESBURY- GEORGETOWN- NEWBURY- NEWBURYPORT- SALISBURY- RESURFACING AND RELATED WORK ON A SECTION OF ROUTE I-95 |
Resurfacing |
COMPLETE |
|
| 603930 |
AMESBURY- GROVELAND- HAVERHILL- NEWBURY- NEWBURYPORT- SALISBURY- SCHEDULED AND EMERGENCY DRAWBRIDGE REPAIRS (NORTH AREA) |
Drawbridge Maintenance |
COMPLETE |
|
| 604648 |
DISTRICT 4- SCHEDULED & EMERGENCY DRAWBRIDGE REPAIRS AND OPERATIONS (NORTH AREA - CONTRACT 2) |
Structures Maintenance |
COMPLETE |
|
| 604842 |
AMESBURY- SALISBURY- RESURFACING & RELATED WORK ON MERRILL ROAD |
Resurfacing |
COMPLETE |
|
| 604855 |
AMESBURY- RESURFACING ON ROUTE 110, FROM MERRIMAC T.L. TO ROUTE 150 |
Resurfacing |
COMPLETE |
|