| 111309 |
PALMER- BRIDGE REPLACEMENT, BR# P-01-024, ROUTE 20 (PARK STREET) OVER CSX & ROUTE 67 NORTHBOUND |
Bridge Replacement |
CONSTRUCTION |
|
| 600259 |
TEMPLETON- RECONSTRUCTION OF ROUTE 202, FROM PHILLIPSTON T.L. TO WINCHENDON T.L. |
Hwy. Reconstr - Minor Widening |
CONSTRUCTION |
|
| 600302 |
HADLEY- NORTHAMPTON- RECONSTRUCTION OF ROUTE 9 (RUSSELL STREET) |
Hwy. Reconstr - Minor Widening |
CONSTRUCTION |
|
| 600548 |
WARREN- BRIDGE REHABILITATION, BR# W-07-006 GILBERT ROAD OVER THE QUABOG RIVER |
Bridge Reconstruction/Rehab |
CONSTRUCTION |
|
| 600551 |
SPRINGFIELD- ROADWAY RECONSTRUCTION ON PARKER STREET INCLUDING BRIDGE REPLACEMENT, BR# S-24-020 CONRAIL OVER PARKER STREET |
Hwy Reconstr-No Added Capacity |
CONSTRUCTION |
|
| 600933 |
WESTFIELD- BRIDGE REHABILITATION, W-25-010, W-25-022 & CONSTRUCTION OF NEW BRIDGE, W-25-052 (GREAT RIVER BRIDGE) |
Bridge Reconstruction/Rehab |
CONSTRUCTION |
2010 |
| 601089 |
ATHOL- BRIDGE REPLACEMENT, A-15-006, ROUTE 2A (MAIN STREET) OVER THE MILLERS RIVER |
Bridge Replacement |
CONSTRUCTION |
|
| 601175 |
WESTHAMPTON- RECONSTRUCTION OF SOUTH ROAD, INCLUDES W-27-014 AND W-27-017, FROM ROUTE 66 TO APPROX. 100' SOUTH OF NORTH/STAGE ROADS (7,900 FEET) |
Hwy. Reconstr - Minor Widening |
CONSTRUCTION |
|
| 601184 |
ERVING- BRIDGE REPLACEMENTS, BR# E-10-013, ROUTE 2 OVER NEC RR & BR# E-10-016, ROUTE 2 OVER ROUTE 63 |
Bridge Replacement |
CONSTRUCTION |
|
| 601502 |
MONSON- RECONSTRUCTION OF LOWER HAMPDEN ROAD, FROM HAMPDEN T.L. TO ELM STREET (4.13 MILES) INCLUDES M-27-034 |
Hwy. Reconstr - Minor Widening |
CONSTRUCTION |
|
| 601585 |
GILL- MONTAGUE- BRIDGE REHABILITATION, G-04-010=M-28-031, AVENUE A OVER CONNECTICUT RIVER & REPAIR OF G-12-020=M-28-001, MONTAGUE CITY ROAD OVER THE CONNECTICUT RIVER |
Bridge Reconstruction/Rehab |
CONSTRUCTION |
2010 |
| 602076 |
MONSON- RECONSTRUCTION OF HOSPITAL ROAD FROM MACOMBER ROAD TO PALMER ROAD (ROUTE 32) , 1.2 KILOMETERS |
Hwy Reconstr-No Added Capacity |
CONSTRUCTION |
|
| 602111 |
CHICOPEE- RECONSTRUCTION OF FRONT STREET |
Hwy Reconstr - Added Capacity |
CONSTRUCTION |
|
| 602334 |
HOLYOKE- BRIDGE REHABILITATION, H-21-038, ROUTE 202 SOUTHBOUND OVER THE B&M RR |
Bridge Reconstruction/Rehab |
CONSTRUCTION |
|
| 602338 |
EAST LONGMEADOW- MULTI-USE PATH CONSTRUCTION (RED STONE TRAIL) |
Bikeway/Bike Path Construction |
CONSTRUCTION |
|
| 602419 |
BELCHERTOWN- PELHAM- RESURFACING AND RELATED WORK ON ROUTE 202 |
Resurfacing |
CONSTRUCTION |
|
| 602420 |
HOLYOKE- RECONSTRUCTION OF COMMERCIAL STREET |
Hwy Reconstr-No Added Capacity |
CONSTRUCTION |
|
| 602536 |
HOLYOKE- BRIDGE REPLACEMENT, H-21-016, LYMAN STREET OVER SECOND LEVEL CANAL |
Bridge Replacement |
CONSTRUCTION |
|
| 602570 |
SPRINGFIELD- BRIDGE BETTERMENT, LONGHILL STREET (NB & SB) AND ROUTE 5 OVER I-91, INCLUDES S-24-049, S-24-050, S-24-051 |
Structures Maintenance |
CONSTRUCTION |
|
| 602575 |
PALMER- RECONSTRUCTION & IMPROVEMENTS OF SPRINGFIELD STREET, FROM THE WILBRAHAM T.L. EASTERLY TO BRIDGE STREET |
Hwy Reconstr - Restr and Rehab |
CONSTRUCTION |
|
| 602652 |
WILBRAHAM- BRIDGE REHABILITATION, W-35-003, RED BRIDGE ROAD OVER NE UTILITIES CANAL |
Bridge Reconstruction/Rehab |
CONSTRUCTION |
|
| 602844 |
SOUTHWICK- RAIL TRAIL CONSTRUCTION (OFF ROAD) FROM CONNECTICUT TO POINT GROVE ROAD (ALONG R.O.W. PENN CEN RR) INCLUDES S-22-003, S-22-008, S-22-017 & TUNNELS (PHASE I) |
Bikeway/Bike Path Construction |
CONSTRUCTION |
|
| 602885 |
NORTHAMPTON- NORWOTTUCK RAIL-TRAIL EXTENSION, FROM LOOK PARK TO LEEDS, INCLUDES N-19-073 (LOOK PARK) & N-19-044 (ARCH STREET) |
Bikeway/Bike Path Construction |
CONSTRUCTION |
|
| 602887 |
NORTHAMPTON- BIKE PATH CONSTRUCTION ON STATE STREET (DOWNTOWN LINK NORWOTTUCK RAIL TRAIL) INCLUDES N-19-005 & N-19-006 |
Bikeway/Bike Path Construction |
CONSTRUCTION |
|
| 602941 |
ERVING- RELOCATION OF A SECTION OF ROUTE 2 AT THE ERVING PAPER MILL |
Highway Relocation |
CONSTRUCTION |
|
| 603076 |
DISTRICT 1- DISTRICT 2- BORINGS, GEOTECHNICAL TESTING AND RELATED WORK |
Drilling & Boring |
CONSTRUCTION |
|
| 603135 |
MONTAGUE- BRIDGE REPLACEMENT, M-28-028, PROSPECT STREET OVER SPRING STREET |
Bridge Replacement |
CONSTRUCTION |
|
| 603262 |
HOLYOKE- CANAL WALK CONSTRUCTION, 1st LEVEL CANAL FROM APPLETON STREET TO DWIGHT STREET (PHASE IA) |
Bikeway/Bike Path Construction |
CONSTRUCTION |
|
| 603290 |
SPRINGFIELD- BRIDGE PRESERVATION, S-24-068, LIBERTY STREET OVER ROUTE I-291 AND S-24-069, ARMORY STREET OVER ROUTE I-291 |
Structures Maintenance |
CONSTRUCTION |
|
| 603335 |
SOUTH HADLEY- HIGHWAY LIGHTING UPGRADE AT ROUTE 202 ROTARY |
Lighting and Electrical |
CONSTRUCTION |
|
| 603395 |
ERVING- RECONSTRUCTION & IMPROVEMENTS ON ROUTE 2, FROM RIVER ROAD TO OLD ROUTE 2 |
Hwy. Reconstr - Minor Widening |
CONSTRUCTION |
|
| 603440 |
EASTHAMPTON- BRIDGE REPLACEMENT, E-05-024, ROUTE I-91 NB & SB OVER EAST STREET |
Bridge Replacement |
CONSTRUCTION |
|
| 603582 |
ATHOL- ORANGE- BRIDGE REPLACEMENT, A-15-030=O-03-020, ROUTE 2 OVER LAKE ROHUNTA |
Bridge Replacement |
CONSTRUCTION |
|
| 603590 |
ORANGE- BRIDGE REPLACEMENT, O-03-021, ROUTE 2 OVER ROUTE 202 |
Bridge Replacement |
CONSTRUCTION |
|
| 603594 |
ORANGE- BRIDGE REPLACEMENT, O-03-024, WEST RIVER STREET OVER ROUTE 2 |
Bridge Replacement |
CONSTRUCTION |
|
| 603689 |
LEVERETT- BRIDGE REHABILITATION, L-09-011, ROUTE 63 (LONG PLAIN ROAD) OVER NEW ENGLAND CENTRAL RAILROAD (NECRR) |
Bridge Reconstruction/Rehab |
CONSTRUCTION |
|
| 603723 |
ERVING- GILL- BRIDGE PRESERVATION JOINT REPAIRS, E-10-014=G-04-009, ROUTE 2 OVER THE CONNECTICUT RIVER |
Structures Maintenance |
CONSTRUCTION |
|
| 603776 |
AMHERST- BRIDGE REPLACEMENT, A-08-020, EAST LEVERETT ROAD OVER MOUNTAIN BROOK |
Bridge Replacement |
CONSTRUCTION |
|
| 603794 |
PETERSHAM- BRIDGE BETTERMENT, P-08-001, ROUTE 32 & 122 OVER THE EAST BRANCH OF THE SWIFT RIVER |
Structures Maintenance |
CONSTRUCTION |
|
| 603827 |
DISTRICT 2- SCHEDULED AND EMERGENCY INSTALLATION OF BRIDGE SHIELDING AT VARIOUS LOCATIONS |
Structures Maintenance |
CONSTRUCTION |
|
| 603969 |
DISTRICT 1- DISTRICT 2- BORING AND GEOTECHNICAL TESTING |
Drilling & Boring |
CONSTRUCTION |
|
| 603996 |
CHICOPEE- RECONSTRUCTION ON CENTER STREET (ROUTE 116) |
Hwy Reconstr - Restr and Rehab |
CONSTRUCTION |
|
| 604020 |
HARDWICK- WARE- BRIDGE REHABILITATION, H-08-012=W-05-002, BRIDGE STREET OVER WARE RIVER (AKA - GILBERTVILLE BRIDGE) |
Bridge Reconstruction/Rehab |
CONSTRUCTION |
|
| 604061 |
GARDNER- WINCHENDON- PEDESTRIAN & BIKE TRAIL CONSTRUCTION & RELATED WORK (NORTH CENTRAL PATHWAY - PHASE IV) INCLUDES W-39-016 & RESURFACING (GARDNER - PHASE III) |
Bikeway/Bike Path Construction |
CONSTRUCTION |
|
| 604062 |
GREENFIELD- SIGNAL & INTERSECTION IMPROVEMENTS AT 8 INTERSECTIONS |
Traffic Signals |
CONSTRUCTION |
2010 |
| 604179 |
CHICOPEE- SPRINGFIELD- RESURFACING, TRAFFIC SIGN REPLACEMENT AND RELATED WORK, I-291 |
Resurfacing |
CONSTRUCTION |
|
| 604193 |
DISTRICT 2- HOT MIX ASPHALT REPAIRS AT VARIOUS LOCATIONS |
Resurfacing |
CONSTRUCTION |
|
| 604207 |
EASTHAMPTON- NORTHAMPTON- MANHAN BIKE TRAIL CONSTRUCTION, FROM EASTHAMPTON LINK TO EARLE STREET, INCLUDES E-05-027=N-19-075 & N-19-001 |
Bikeway/Bike Path Construction |
CONSTRUCTION |
|
| 604218 |
SPRINGFIELD- BRIDGE PRESERVATION, S-24-032, STATE STREET OVER ROOSEVELT AVENUE |
Structures Maintenance |
CONSTRUCTION |
|
| 604219 |
NORTHAMPTON- MANHAN/NORWOTTUCK TRAIL CONSTRUCTION, INCLUDING EARLE STREET/GROVE STREET INTERSECTION TO NEW SOUTH STREET, INCLUDES BR# N-19-072 |
Bikeway/Bike Path Construction |
CONSTRUCTION |
|
| 604220 |
ROYALSTON- RECLAMATION OF ATHOL RICHMOND ROAD (ROUTE 32), FROM ELM AVENUE TO THE N.H. S.L |
Reclamation |
CONSTRUCTION |
|
| 604221 |
NORTHFIELD- SCENIC BYWAY CONSTRUCTION ON ROUTE 10/63 (PHASE I) |
Hwy Reconstr - Restr and Rehab |
CONSTRUCTION |
|
| 604373 |
BARRE- RESURFACING & RELATED WORK ON ROUTE 122 (WEST STREET) INCLUDES ROUTE 62 (HUBBARDSTON ROAD) |
Resurfacing |
CONSTRUCTION |
|
| 604422 |
HAMPDEN- BRIDGE SUPERSTRUCTURE REPLACEMENT, H-04-003, CHAPIN ROAD OVER SCANTIC RIVER |
Bridge Replacement |
CONSTRUCTION |
|
| 604436 |
GREENFIELD- INTERSTATE RESURFACING ON ROUTE I-91 |
Resurfacing |
CONSTRUCTION |
|
| 604437 |
LUDLOW- SIGNAL & INTERSECTION IMPROVEMENTS AT EAST STREET AND CHAPIN STREET |
Traffic Signals |
CONSTRUCTION |
2010 |
| 604443 |
SOUTHWICK- RAIL TRAIL EXTENSION, FROM POINT GROVE ROAD TO WESTFIELD CITY LINE (PHASE II) |
Bikeway/Bike Path Construction |
CONSTRUCTION |
|
| 604444 |
SOUTHWICK- (PHASE I) RECONSTRUCTION WITH CULVERT REPLACEMENT, ROUTE 168 (CONGAMOND ROAD) |
Hwy. Reconstr - Minor Widening |
CONSTRUCTION |
|
| 604447 |
SPRINGFIELD- RECONSTRUCTION OF STATE STREET (CORRIDOR IMPROVEMENTS) |
Hwy Reconstr - Restr and Rehab |
CONSTRUCTION |
|
| 604604 |
CHICOPEE- SPRINGFIELD- INTERSTATE MAINTENANCE & RELATED WORK ON I-91 |
Resurfacing |
CONSTRUCTION |
|
| 604635 |
DISTRICT 2- ITS EQUIPMENT REPAIRS ALONG STATE HIGHWAY |
Intelligent Transportation Sys |
CONSTRUCTION |
|
| 604822 |
SPRINGFIELD- INTERSECTION & SIGNAL IMPROVEMENTS ON ROOSEVELT AVENUE, PAGE BOULEVARD AND BAY STREET (MEMORIAL INDUSTRIAL PARK II) |
Hwy Reconstr-No Added Capacity |
CONSTRUCTION |
|
| 604933 |
SOUTH HADLEY- BRIDGE PRESERVATION, S-18-015, ROUTE 202 OVER BARDWELL STREET & S-18-016, ROUTE 202 OVER ROUTE 116 |
Structures Maintenance |
CONSTRUCTION |
|
| 604982 |
AGAWAM- SPRINGFIELD- BRIDGE PRESERVATION (PAINTING), A-05-001=S-24-005, ROUTE 5 OVER THE CONNECTICUT RIVER |
Structures Maintenance |
CONSTRUCTION |
|
| 605057 |
CHICOPEE-WEST SPRINGFIELD- BRIDGE PRESERVATION, C-13-034=W-21-043, I-91 OVER CONNECTICUT RIVER |
Structures Maintenance |
CONSTRUCTION |
|
| 605124 |
DISTRICT 2- DRAINAGE BETTERMENT & CULVERT REPAIR |
Catch Basin Cleaning |
CONSTRUCTION |
|
| 605127 |
DISTRICT 2- INSTALLATION OF ENHANCED REFERENCE LOCATION SIGNS AT VARIOUS LOCATIONS (4 CONTRACTS) |
Sign Installation/Upgrading |
CONSTRUCTION |
|
| 605147 |
DISTRICT 2- TREE REMOVAL AND SAFETY SIGHT DISTANCE CLEARING |
Landscape and Roadside Develop |
CONSTRUCTION |
|
| 605148 |
DISTRICT 2- HOT MIX ASPHALT REPAIRS AT VARIOUS LOCATIONS |
Hwy Reconstr - Restr and Rehab |
CONSTRUCTION |
|
| 605149 |
DISTRICT 2- TRAFFIC SIGNAL BETTERMENT AT VARIOUS LOCATIONS |
Traffic Signals |
CONSTRUCTION |
|
| 605192 |
DISTRICT 2- INSTALLATION OF OVERHEAD & GROUND MOUNTED GUIDE SIGNS |
Sign Installation/Upgrading |
CONSTRUCTION |
|
| 605193 |
DISTRICT 2- APPLICATION OF REFLECTORIZED (THERMOPLASTIC) PAVEMENT MARKINGS AT VARIOUS LOCATIONS |
Pavement Marking |
CONSTRUCTION |
|
| 605221 |
DISTRICT 1- DISTRICT 2- BORING & GEOTECHNICAL TESTING & RELATED WORK AT VARIOUS LOCATIONS |
Drilling & Boring |
CONSTRUCTION |
|
| 605236 |
DISTRICT 2- BRIDGE SUBSTRUCTURE REPAIRS (SECTION 2A) |
Structures Maintenance |
CONSTRUCTION |
|
| 605237 |
DISTRICT 2- BRIDGE SUBSTRUCTURE REPAIRS (SECTION 2B) |
Structures Maintenance |
CONSTRUCTION |
|
| 605245 |
DISTRICT 2- SCHEDULED & EMERGENCY TRAFFIC MANAGEMENT AT VARIOUS LOCATIONS |
Miscellaneous/No Prequal |
CONSTRUCTION |
|
| 605248 |
DISTRICT 2- FACILITY REPAIRS AT VARIOUS LOCATIONS |
Miscellaneous/No Prequal |
CONSTRUCTION |
|
| 605252 |
DISTRICT 2- ADMINISTRATION BUILDING ELECTRICAL REPAIRS & UPGRADES |
Lighting and Electrical |
CONSTRUCTION |
|
| 605369 |
DISTRICT 2- DRAINAGE BETTERMENT & CULVERT REPAIR |
Catch Basin Cleaning |
CONSTRUCTION |
|
| 605370 |
DISTRICT 2- HIGHWAY LIGHTING REPAIRS AT VARIOUS LOCATIONS |
Lighting and Electrical |
CONSTRUCTION |
|
| 605378 |
DISTRICT 2- RECONSTRUCTION OF DRAINAGE STRUCTURES IN SECTION A |
Catch Basin Cleaning |
CONSTRUCTION |
|
| 605379 |
DISTRICT 2- RECONSTRUCTION OF DRAINAGE STRUCTURES IN SECTION B |
Catch Basin Cleaning |
CONSTRUCTION |
|
| 605387 |
DISTRICT 2- NON-ROUTINE & EMERGENCY STRUCTURAL REPAIRS IN SECTION 2A |
Structures Maintenance |
CONSTRUCTION |
|
| 605388 |
DISTRICT 2- NON-ROUTINE & EMERGENCY STRUCTURAL REPAIRS IN SECTION 2B |
Structures Maintenance |
CONSTRUCTION |
|
| 605397 |
DISTRICT 2- ADMINISTRATION BUILDING SERVER ROOM RELOCATION & UPGRADE |
Intelligent Transportation Sys |
CONSTRUCTION |
|
| 605539 |
GILL- ERVING- ORANGE- WENDELL- RESURFACING & RELATED WORK ON ROUTE 2 |
Resurfacing |
CONSTRUCTION |
|
| 605540 |
BELCHERTOWN- WARE- RESURFACING & RELATED WORK ON ROUTE 9 |
Resurfacing |
CONSTRUCTION |
|
| 605541 |
EASTHAMPTON- GREENFIELD- NORTHAMPTON- SOUTHAMPTON- WESTFIELD- RESURFACING & RELATED WORK ON ROUTES 5 &10 |
Resurfacing |
CONSTRUCTION |
|
| 605544 |
DISTRICT 2- REPAIRS TO IMPACT ATTENUATORS (CRASH CUSHION) AT VARIOUS LOCATIONS |
Impact Attenuators |
CONSTRUCTION |
|
| 605577 |
AGAWAM- CABLE BARRIER INSTALLATION ON ROUTE 57 |
Guard Rail & Fencing |
CONSTRUCTION |
|
| 605578 |
EASTHAMPTON- HOLYOKE- NORTHAMPTON- WEST SPRINGFIELD- CABLE BARRIER INSTALLATION ON I-91 |
Guard Rail & Fencing |
CONSTRUCTION |
|
| 605626 |
DISTRICT 2- BRIDGE DECK JOINT REPAIRS AT VARIOUS LOCATIONS |
Structures Maintenance |
CONSTRUCTION |
|
| 605627 |
DISTRICT 2- BRIDGE SHIELDING INSTALLATION AT VARIOUS LOCATIONS |
Structures Maintenance |
CONSTRUCTION |
|
| 605628 |
DISTRICT 2- BRIDGE DECK REPAIRS AT VARIOUS LOCATIONS |
Structures Maintenance |
CONSTRUCTION |
|
| 605634 |
NORTHAMPTON- IMPROVEMENTS ON JACKSON STREET (SAFE ROUTES TO SCHOOL), INCLUDING NEW BIKEWAY RAMP
|
Bikeway/Bike Path Construction |
CONSTRUCTION |
|
| 605681 |
DISTRICT 2- EMERGENCY REPAIRS TO TRAFFIC SIGNALS |
Traffic Signals |
CONSTRUCTION |
|
| 605709 |
CHICOPEE- RESURFACING & RELATED WORK ON BURNETT ROAD, FROM NEW LOMBARD ROAD TO LUDLOW T.L. |
Resurfacing |
CONSTRUCTION |
2010 |
| 605711 |
LONGMEADOW- BERNARDSTON- MOTORIST AID SYSTEM (CALL BOXES) MAINTENANCE & REPAIR ON I-91 |
Intelligent Transportation Sys |
CONSTRUCTION |
|
| 605715 |
DISTRICT 2- SUBSTRUCTURE REPAIRS AT VARIOUS LOCATIONS |
Structures Maintenance |
CONSTRUCTION |
|
| 605716 |
DISTRICT 2- GUARDRAIL REPAIRS AT VARIOUS LOCATIONS |
Guard Rail & Fencing |
CONSTRUCTION |
|
| 605717 |
DISTRICT 2- FENCE REPAIRS & UPGRADES AT VARIOUS LOCATIONS |
Guard Rail & Fencing |
CONSTRUCTION |
|
| 15350 |
NORTHAMPTON- BRIDGE REHABILITATION, N-19-047, CLEMENT STREET OVER THE MILL RIVER |
Bridge Reconstruction/Rehab |
DESIGN |
|
| 49710 |
DEERFIELD- BRIDGE REPLACEMENT, D-06-004, NORTH MAIN STREET OVER THE B&M RAILROAD |
Bridge Replacement |
DESIGN |
|
| 82250 |
AMHERST- RECONSTRUCTION & RELATED WORK ON ROUTE 116 (WEST STREET) |
Hwy Reconstr-No Added Capacity |
DESIGN |
|
| 82611 |
CHICOPEE- HOLYOKE- BRIDGE REHABILITATION, C-13-012=H-21-030, ROUTE 116 (CHICOPEE/CABOT ST) OVER CONNECTICUT RIVER & PV RR |
Bridge Reconstruction/Rehab |
DESIGN |
2010 |
| 102710 |
WINCHENDON- RECONSTRUCTION OF GLENALLEN STREET (ROUTE 202) FROM MAPLE STREET INTERSECTION TO RINDGE, N.H. STATE LINE |
Hwy Reconstr-No Added Capacity |
DESIGN |
|
| 156004 |
WESTFIELD- MAINTENANCE SITE IMPROVEMENT RE-ESTABLISH CHANNEL & SLOPE OF LITTLE RIVER @ MAIN LINE DRIVE |
Vertical Construction (Ch 149) |
DESIGN |
|
| 160045 |
WESTFIELD- BRIDGE REPLACEMENT, W-25-011, POCHASSIC STREET OVER THE PV RAILROAD & ACCESS ROAD |
Bridge Replacement |
DESIGN |
2012 |
| 180525 |
NORTHAMPTON- RECONSTRUCTION OF DAMON ROAD, FROM ROUTE 9 INTERSECTION TO ROUTE 5 INTERSECTION |
Hwy Reconstr-No Added Capacity |
DESIGN |
|
| 400102 |
ATHOL- BRIDGE REPLACEMENTS, BR# A-15-009 CHESTNUT HILL AVENUE (ROUTE 32) OVER THE MILLER'S RIVER & A-15-012 OVER THE B&M RR |
Bridge Replacement |
DESIGN |
|
| 400103 |
WESTFIELD- BRIDGE REPLACEMENT, W-25-006, ROUTE 10/202 (SOUTHWICK ROAD) OVER THE LITTLE RIVER |
Bridge Replacement |
DESIGN |
|
| 600513 |
AGAWAM- RECONSTRUCTION OF A SECTION OF ROUTE 187 (NORTH WESTFIELD STREET) 3.0 MILES |
Hwy Reconstr-No Added Capacity |
DESIGN |
|
| 600935 |
HOLYOKE- BRIDGE REPLACEMENTS, H-21-014, ROUTE 141 (APPLETON STREET) OVER SECOND LEVEL CANAL & H-21-020 OVER FIRST LEVEL CANAL |
Bridge Replacement |
DESIGN |
|
| 600936 |
HOLYOKE- BRIDGE REPLACEMENT, H-21-018, LYMAN STREET OVER FIRST LEVEL CANAL |
Bridge Replacement |
DESIGN |
|
| 601154 |
PELHAM- RECONSTRUCTION OF AMHERST ROAD, FROM THE AMHERST T.L. TO 0.6 MILES EAST OF ROUTE 202 (4.2 MILES) |
Hwy. Reconstr - Minor Widening |
DESIGN |
2012 |
| 601156 |
LUDLOW- SPRINGFIELD- BRIDGE REHABILITATION, L-16-008=S-24-002, ROUTE 21 (CENTER STREET) OVER CHICOPEE RIVER (PUTTS BRIDGE) |
Bridge Replacement |
DESIGN |
|
| 601186 |
GREENFIELD- MONTAGUE- BRIDGE REHABILITATION, G-12-020=M-28-001, MONTAGUE CITY ROAD OVER CONNECTICUT RIVER (GENERAL PIERCE BR) |
Bridge Reconstruction/Rehab |
DESIGN |
|
| 601322 |
SOUTHWICK- BRIDGE REPLACEMENT, S-22-005, ROUTE 202/ROUTE 10 OVER JOHNSON BROOK |
Bridge Replacement |
DESIGN |
2010 |
| 601350 |
EAST LONGMEADOW- RECONSTRUCTION OF ELM STREET, FROM SPRINGFIELD C.L. TO CENTER SQUARE ROTARY |
Hwy Reconstr-No Added Capacity |
DESIGN |
|
| 601493 |
SPRINGFIELD- BRIDGE REHABILITATION, BR# S-24-068 LIBERTY STREET OVER ROUTE I-291 |
Structures Maintenance |
DESIGN |
|
| 601504 |
PALMER- RECONSTRUCTION OF ROUTE 32 (WARE ROAD) FROM 300' SOUTH OF STIMSON STREET TO WARE T.L. (4.0 MILES) |
Hwy Reconstr-No Added Capacity |
DESIGN |
|
| 601565 |
ERVING- NORTHFIELD- RECONSTRUCTION OF ROUTE 63, FROM SEMB DRIVE TO M.M. 18.2 |
Resurfacing |
DESIGN |
|
| 601657 |
MONTAGUE- RECONSTRUCTION ON GREENFIELD ROAD, FROM TURNERS FALLS ROAD TO STA. 378+00 (3.49 MILES) |
Hwy Reconstr-No Added Capacity |
DESIGN |
|
| 601672 |
CHICOPEE- SOUTH HADLEY- SIGNAL UPGRADE ON ROUTE 33 (MEMORIAL DRIVE) FROM ABBEY STREET TO FULLER ROAD |
Traffic Signals |
DESIGN |
|
| 601701 |
WARE- BRIDGE REPLACEMENT, W-05-003, MASS CENTRAL RR OVER ROUTE 9 & 32 (EAST MAIN STREET) |
Bridge Replacement |
DESIGN |
|
| 601796 |
WEST BROOKFIELD- BRIDGE REPLACEMENT, W-19-006, LONG HILL ROAD OVER CSX RR |
Bridge Replacement |
DESIGN |
2010 |
| 601894 |
GREENFIELD- BRIDGE REHABILITATION, G-12-010, EUNICE WILLIAMS ROAD OVER THE GREEN RIVER |
Bridge Reconstruction/Rehab |
DESIGN |
|
| 602178 |
MONSON- BRIDGE REPLACEMENT, M-27-011, HOSPITAL ROAD OVER THE QUABOAG STREAM |
Bridge Replacement |
DESIGN |
|
| 602319 |
NORTHFIELD- BRIDGE REPLACEMENT, BR# N-22-010 BIRNAM ROAD OVER MILL BROOK |
Bridge Replacement |
DESIGN |
|
| 602320 |
DEERFIELD- BRIDGE PRESERVATION, D-06-023, MCCLELLAN FARM ROAD OVER THE B&M RAILROAD |
Structures Maintenance |
DESIGN |
|
| 602381 |
NORTHAMPTON- BRIDGE PRESERVATION, N-19-059, & N-19-060, I-91 (NB & SB) OVER ROUTE 5 & B&M RR AND HOCKANUM ROAD |
Structures Maintenance |
DESIGN |
|
| 602486 |
EASTHAMPTON- INTERSECTION IMPROVEMENTS @ POMEROY MEADOW ROAD, LOUDVILLE ROAD, GLENDALE STREET, WEST STREET |
Hwy Reconstr-No Added Capacity |
DESIGN |
|
| 602540 |
BRIMFIELD- BRIDGE REPLACEMENT, B-24-006, ST ROUTE 19 (WALES ROAD) OVER MILL BROOK INCLUDING REPAIR OF ABUTMENT |
Bridge Replacement |
DESIGN |
|
| 602600 |
SPRINGFIELD- BRIDGE REPLACEMENTS, S-24-090 & S-24-091, ROOSEVELT AVENUE OVER CONRAIL SPUR & MAIN (DOUBLESTACK) LINE |
Bridge Replacement |
DESIGN |
2011 |
| 602638 |
BELCHERTOWN- POSTED PROPOSAL TO COVER THE COST OF REPLACING A WELL AND WATERLINE CONNECTION ON PRIVATE PROPERTY ON STATE STREET |
Posted Proposal |
DESIGN |
|
| 602653 |
AGAWAM- RECONSTRUCTION OF ROUTE 159 (MAIN STREET) FROM CONNECTICUT STATE LINE TO ROUTE 75 |
Hwy Reconstr - Added Capacity |
DESIGN |
2013 |
| 602796 |
HADLEY- RECONSTRUCTION OF SOUTH MAPLE STREET, FROM ROUTE 9 (RUSSELL STREET) SOUTHERLY TO BAY ROAD, INCLUDES REHAB OF H-01-006 |
Hwy Reconstr-No Added Capacity |
DESIGN |
|
| 602813 |
TEMPLETON- CONSTRUCTION OF A SANITARY BUILDING AT THE ROUTE 2 EASTBOUND REST AREA |
Vertical Construction (Ch 149) |
DESIGN |
|
| 602911 |
CHICOPEE- CONNECTICUT RIVERWALK & BIKEWAY CONSTRUCTION, FROM THE SPRINGFIELD C.L. TO NASH FIELD |
Bikeway/Bike Path Construction |
DESIGN |
|
| 602912 |
CHICOPEE- MULTI-USE PATH CONSTRUCTION ON CHICOPEE RIVER, AT DEPOT STREET AND FRONT STREET |
Bikeway/Bike Path Construction |
DESIGN |
2013 |
| 602925 |
HOLYOKE- REHABILITATION OF PLEASANT STREET, FROM 580 FEET SOUTH OF YALE STREET NORTHERLY TO NORTHAMPTON STREET |
Hwy Reconstr - Restr and Rehab |
DESIGN |
|
| 602942 |
ORANGE- IMPROVEMENTS ALONG ROUTE 2, INCLUDES REHAB OF O-03-022 & CONSTRUCTION OF 0-03-026 (WILD LIFE PASSAGE) |
Hwy Reconstr - Restr and Rehab |
DESIGN |
2010 |
| 603024 |
SOUTHAMPTON- BRIDGE REPLACEMENT, S-19-024, VALLEY ROAD OVER MOOSE BROOK |
Bridge Replacement |
DESIGN |
|
| 603041 |
DISTRICT 1- DISTRICT 2- DISTRICT 3- DISTRICT 4- DISTRICT 5- TRAFFIC SIGNAL CONTROLLERS & COMPLETE CABINETS STOCKROOM REPLACEMENT |
Traffic Signals |
DESIGN |
|
| 603054 |
NORTHAMPTON- ROUNDABOUT CONSTRUCTION AT NORTH MAIN STREET, BRIDGE ROAD AND LOOK MEMORIAL PARK ENTRANCE |
Traffic Signals |
DESIGN |
|
| 603180 |
CHICOPEE- BRIDGE REPLACEMENT, C-13-008, ROUTE 116 (SPRINGFIELD STREET) OVER THE CHICOPEE RIVER (AKA - DAVITT MEMORIAL BRIDGE) & BRIDGE REHABILITATION, C-13-007, ROUTE 116 (SPRINGFIELD STREET) OVER DWIGHT MFG. CANAL |
Bridge Replacement |
DESIGN |
|
| 603263 |
HOLYOKE- CANAL WALK EXTENSION, 2ND LEVEL CANAL FROM APPLETON STREET TO DWIGHT STREET (PHASE II) |
Bikeway/Bike Path Construction |
DESIGN |
2010 |
| 603278 |
SPRINGFIELD- WEST SPRINGFIELD- BRIDGE BETTERMENT (SCOUR COUNTERMEASURES), S-24-003=W-21-002, ROUTE 20 (PARK AVENUE) OVER CONNECTICUT RIVER |
Structures Maintenance |
DESIGN |
|
| 603318 |
WESTFIELD- RECONSTRUCTION OF ROUTE 20 (MAIN STREET) AND ROUTE 10/202 (BROAD STREET) |
Hwy Reconstr-No Added Capacity |
DESIGN |
2010 |
| 603330 |
WESTFIELD- RECONSTRUCTION ON ROUTE 202 (ELM STREET & NORTH ELM STREET) |
Hwy Reconstr - Added Capacity |
DESIGN |
|
| 603371 |
ORANGE- RECONSTRUCTION OF NORTH MAIN STREET, FROM SCHOOL STREET TO DEXTER STREET |
Hwy Reconstr - Restr and Rehab |
DESIGN |
|
| 603372 |
AGAWAM- RECONSTRUCTION ON ROUTE 5 CONNECTOR TO ROUTE 57, INCLUDES A-05-013 & A-05-014 |
Hwy Reconstr - Added Capacity |
DESIGN |
|
| 603449 |
WESTFIELD- RECONSTRUCTION ON COURT STREET & WESTERN AVENUE |
Hwy Reconstr - Added Capacity |
DESIGN |
|
| 603454 |
WARE- BIKEWAY/BIKE PATH CONSTRUCTION, WARE RIVER VALLEY RAILTRAIL |
Bikeway/Bike Path Construction |
DESIGN |
|
| 603477 |
SOUTHWICK- RECONSTRUCTION ON ROUTE 57 (FEEDING HILLS ROAD) & ROUTE 10/202 (COLLEGE HIGHWAY) |
Hwy Reconstr - Added Capacity |
DESIGN |
|
| 603478 |
DEERFIELD- BRIDGE REHABILITATION, D-06-044 & D-06-045, ROUTE I-91 (NB & SB) OVER THE DEERFIELD RIVER (STILLWATER ROAD AND LOWER ROAD) |
Bridge Reconstruction/Rehab |
DESIGN |
2011 |
| 603495 |
PHILLIPSTON- BRIDGE REPLACEMENT, P-09-004, ROUTE 2 OVER ROUTE 2A (STATE ROAD) |
Bridge Replacement |
DESIGN |
2010 |
| 603504 |
GILL- GREENFIELD- BRIDGE REPLACEMENT, G-04-003=G-12-004, ROUTE 2 OVER FALLS RIVER |
Bridge Replacement |
DESIGN |
2010 |
| 603517 |
SPRINGFIELD- BRIDGE RECONSTRUCTION, ROUTE I- 91, BR#'S S-24-061-1, S-24-061A, S-24-061-2 (VIADUCT), S-24-057, S-24-056, S-24-054 |
Bridge Reconstruction/Rehab |
DESIGN |
|
| 603543 |
SPRINGFIELD- LANDSCAPING ON COLUMBUS AVENUE (EAST & WEST) ALONG ROUTE I-91 RAMP RELOCATION |
Landscape and Roadside Develop |
DESIGN |
2010 |
| 603604 |
ERVING- BRIDGE REPLACEMENT, E-10-011, CHURCH STREET OVER KEYUP BROOK |
Bridge Replacement |
DESIGN |
|
| 603608 |
HATFIELD- BRIDGE BETTERMENT, H-11-025, ELM STREET OVER THE B&M R.R. |
Structures Maintenance |
DESIGN |
|
| 603705 |
BRIMFIELD- PALMER- BRIDGE REPLACEMENT, B-24-012=P-01-011, KING'S BRIDGE OVER QUABOAG RIVER |
Bridge Replacement |
DESIGN |
2010 |
| 603719 |
BARRE- BRIDGE REPLACEMENT, B-02-009, ROUTE 32 (MAIN STREET) OVER WARE CANAL |
Bridge Replacement |
DESIGN |
|
| 603727 |
ATHOL- ORANGE- BRIDGE REPLACEMENT, A-15-017=O-03-001, LOGAN ROAD OVER THE EAST BRANCH OF THE TULLY RIVER |
Bridge Replacement |
DESIGN |
|
| 603729 |
NORTHAMPTON- BRIDGE REPLACEMENT, N-19-029, RIVER ROAD OVER THE MILL RIVER |
Bridge Replacement |
DESIGN |
|
| 603730 |
WEST SPRINGFIELD- CONNECTICUT RIVERWALK & BIKEWAY EXTENSION, FROM ELM STREET TO DOTY CIRCLE |
Bikeway/Bike Path Construction |
DESIGN |
|
| 603731 |
AGAWAM- CONSTRUCTION OF BIKEWAY LOOP CONNECTING CONNECTICUT RIVERWALK WITH MAIN STREET |
Bikeway/Bike Path Construction |
DESIGN |
|
| 603735 |
HOLYOKE- BRIDGE REPLACEMENT, H-21-039, ROUTE 202 (BEECH STREET) OVER B&M R.R. |
Bridge Replacement |
DESIGN |
|
| 603783 |
WESTFIELD- COLUMBIA GREENWAY RAIL TRAIL CONSTRUCTION - Center (Downtown) Section - Columbia Mfg Spur to Cowles Ct. |
Bikeway/Bike Path Construction |
DESIGN |
|
| 603820 |
NEW SALEM- PELHAM- SHUTESBURY- RESURFACING & RELATED WORK ON A SECTION OF ROUTE 202 (DANIEL SHAYS HIGHWAY) |
Resurfacing |
DESIGN |
|
| 603850 |
WARE- POSTED PROPOSAL TO COVER COST OF BOTTLED WATER AND DRILLING REPLACEMENT WELL ON TRUDEAU PROPERTY CONTAMINATED BY SODIUM |
Posted Proposal |
DESIGN |
|
| 603873 |
PALMER- RESURFACING & RELATED WORK ON ROUTE 20 |
Resurfacing |
DESIGN |
|
| 603874 |
WARE- RESURFACING & RELATED WORK ON ROUTE 9 |
Resurfacing |
DESIGN |
|
| 603876 |
DEERFIELD- GREENFIELD- RESURFACING & RELATED WORK ON ROUTE 5 & M831 (MONTAGUE CITY ROAD) |
Resurfacing |
DESIGN |
|
| 603878 |
NEW SALEM- POSTED PROPOSAL TO COVER THE COST OF REPLACING A WELL AND WATERLINE CONNECTION ON PRIVATE PROPERTY ON PETERSHAM ROAD |
Posted Proposal |
DESIGN |
|
| 603903 |
LONGMEADOW- BERNARDSTON- INSTALLATION OF ADVANCED TRAFFIC MANAGEMENT SYSTEM ON I-91 CORRIDOR |
Intelligent Transportation Sys |
DESIGN |
2010 |
| 603905 |
BELCHERTOWN- POSTED PROPOSAL TO COVER THE COST OF REPLACING A WELL AND WATERLINE CONNECTION ON PRIVATE PROPERTY ON FEDERAL ST. |
Posted Proposal |
DESIGN |
|
| 603935 |
DISTRICT 2- INSTALLATION & REPAIR OF SCOUR COUNTERMEASURES AND SUBSTRUCTURES AT 6 LOCATIONS |
Structures Maintenance |
DESIGN |
|
| 604023 |
AMHERST- BRIDGE REHABILITATION, A-08-006, PELHAM ROAD OVER FORT RIVER |
Bridge Reconstruction/Rehab |
DESIGN |
|
| 604030 |
PALMER- BRIDGE REPLACEMENT, P-01-018, STATE STREET OVER THE WARE RIVER |
Bridge Replacement |
DESIGN |
2010 |
| 604033 |
SOUTHWICK- RECONSTRUCTION CONGAMOND ROAD (ROUTE 168) 1.2 MILES |
Hwy Reconstr-No Added Capacity |
DESIGN |
|
| 604035 |
HADLEY- SIGNAL & INTERSECTION IMPROVEMENTS AT ROUTE 9 (RUSSELL STREET) & ROUTE 47 (MIDDLE STREET) |
Traffic Signals |
DESIGN |
2013 |
| 604043 |
AMHERST- RECONSTRUCTION ON ROUTE 116, FROM WEST STREET TO ATKINS STREET |
Hwy Reconstr - Restr and Rehab |
DESIGN |
2010 |
| 604048 |
EASTHAMPTON- BRIDGE REPLACEMENT, E-05-006, ROUTE 10 (NORTHAMPTON STREET) OVER MANHAN RIVER |
Bridge Replacement |
DESIGN |
|
| 604049 |
HADLEY- BRIDGE REPLACEMENT, H-01-017, NORTH HADLEY ROAD OVER ROUTE 116 |
Bridge Replacement |
DESIGN |
|
| 604136 |
MONSON- PALMER- BRIDGE REPLACEMENT, M-27-007=P-01-007, STATE AVENUE OVER THE QUABOAG RIVER |
Bridge Replacement |
DESIGN |
|
| 604153 |
SOUTHWICK- RESURFACING & RELATED WORK ON ROUTE 10/202 (COLLEGE HIGHWAY - SOUTHERLY SECTION) FROM 0.2 MILES SOUTH OF ROUTE 57, WEST TO THE CT STATE LINE |
Resurfacing |
DESIGN |
|
| 604154 |
SOUTHWICK- RECONSTRUCTION OF ROUTE 10/202 (COLLEGE HIGHWAY - CENTER SECTION) FROM TANNERY ROAD TO 0.2 MILES SOUTH OF ROUTE 57 |
Hwy. Reconstr - Minor Widening |
DESIGN |
2010 |
| 604155 |
SOUTHWICK- RESURFACING & RELATED WORK ON ROUTE 10/202, COLLEGE HIGHWAY (NORTHERLY SECTION) FROM THE WESFIELD/SOUTHWICH T.L. TO TANNERY ROAD |
Hwy. Reconstr - Minor Widening |
DESIGN |
|
| 604175 |
ROYALSTON- BRIDGE REPLACEMENT, R-12-004, NORTHEAST FITZWILLIAM ROAD OVER THE LAWRENCE BROOK |
Bridge Replacement |
DESIGN |
|
| 604189 |
BERNARDSTON- BRIDGE REPLACEMENT, B-10-004, BRATTLEBORO ROAD (SHATTUCK BROOK) |
Bridge Replacement |
DESIGN |
|
| 604190 |
BELCHERTOWN- CONSTRUCTION OF A CHEMICAL STORAGE SHED |
Vertical Construction (Ch 149) |
DESIGN |
|
| 604203 |
AGAWAM- INTERSECTION IMPROVEMENTS AT ROUTE 187 & ROUTE 57 |
Traffic Signals |
DESIGN |
|
| 604209 |
HOLYOKE- WEST SPRINGFIELD- REHABILITATION OF ROUTE 5 (RIVERDALE ROAD) FROM ASHLEY AVENUE TO MAIN STREET |
Resurfacing |
DESIGN |
|
| 604210 |
WEST SPRINGFIELD- RECONSTRUCTION OF ROUTE 5 (RIVERDALE STREET) FROM I-91 TO MONTEREY DRIVE |
Hwy. Reconstr - Minor Widening |
DESIGN |
2010 |
| 604212 |
WARE- BRIDGE REPLACEMENT, W-05-004, ROUTE 9 (EAST STREET) OVER THE WARE RIVER |
Bridge Replacement |
DESIGN |
|
| 604222 |
NORTHAMPTON- WHATELY- PARK & RIDE CONSTRUCTION |
Miscellaneous/No Prequal |
DESIGN |
|
| 604227 |
BARRE- TOWN COMMON IMPROVEMENTS |
Hwy Reconstr - Restr and Rehab |
DESIGN |
2013 |
| 604242 |
NORTHAMPTON- BRIDGE REPLACEMENT, N-19-035, KENNEDY ROAD OVER ROBERTS MEADOW BROOK |
Bridge Replacement |
DESIGN |
|
| 604243 |
WHATELY- BRIDGE REPLACEMENT, W-33-009, HAYDENVILLE ROAD OVER WEST BROOK |
Bridge Reconstruction/Rehab |
DESIGN |
2010 |
| 604339 |
WESTHAMPTON- BRIDGE REHABILITATION, W-27-015, NORTH ROAD OVER ROBERTS MEADOW BROOK |
Bridge Replacement |
DESIGN |
|
| 604366 |
TEMPLETON- BRIDGE REPLACEMENT, T-02-019, NORTH MAIN STREET OVER EAST TEMPLETON POND OUTLET |
Bridge Reconstruction/Rehab |
DESIGN |
2011 |
| 604429 |
PELHAM- BRIDGE REPLACEMENTS, P-04-006, MEETINGHOUSE ROAD OVER AMETHYST BROOK & P-04-007, MEETINGHOUSE ROAD OVER HARRIS BROOK |
Bridge Replacement |
DESIGN |
|
| 604433 |
BELCHERTOWN- RECLAMATION & RELATED WORK ON ROUTE 181 |
Hwy. Reconstr - Minor Widening |
DESIGN |
2013 |
| 604434 |
CHICOPEE- RECONSTRUCTION & RELATED WORK ON FULLER ROAD |
Hwy. Reconstr - Minor Widening |
DESIGN |
|
| 604435 |
CHICOPEE- SIGNAL & INTERSECTION IMPROVEMENTS AT MEMORIAL DRIVE (ROUTE 33) & BROADWAY |
Traffic Signals |
DESIGN |
|
| 604439 |
WINCHENDON- MULTI-USE TRAIL CONSTRUCTION (NORTH CENTRAL PATHWAY - PHASE V) INCLUDES W-39-023, W-39-024 & W-39-028 |
Bikeway/Bike Path Construction |
DESIGN |
2010 |
| 604440 |
SUNDERLAND- SCENIC TURNOUT ON CONNECTICUT RIVER SCENIC FARM BYWAY, ROUTE 47 |
Landscape and Roadside Develop |
DESIGN |
|
| 604441 |
EASTHAMPTON- SOUTHAMPTON- TRAIL CONSTRUCTION (MANHAN RAIL TRAIL), FROM SOUTH STREET TO COLEMAN ROAD |
Bikeway/Bike Path Construction |
DESIGN |
2010 |
| 604442 |
WESTFIELD- RECONSTRUCTION OF ROUTE 187 (FEEDING HILLS ROAD) |
Hwy. Reconstr - Minor Widening |
DESIGN |
|
| 604445 |
WESTFIELD- RECONSTRUCTION ON ROUTE 187, INCLUDES REPLACEMENT OF W-25-002, SHERMAN'S MILL BRIDGE OVER GREAT BROOK AT PONTOOSIC ROAD |
Hwy Reconstr - Restr and Rehab |
DESIGN |
|
| 604446 |
WESTFIELD- RECONSTRUCTION OF ROUTE 187 (LITTLE RIVER ROAD) AND SHAKER ROAD |
Hwy. Reconstr - Minor Widening |
DESIGN |
|
| 604448 |
SPRINGFIELD- SIGNAL & INTERSECTION IMPROVEMENTS @ MAIN STREET, FRONT STREET, MYRTLE STREET(ROUTE 141) INDIAN ORCHARD |
Traffic Signals |
DESIGN |
|
| 604449 |
SPRINGFIELD- NORTH END & BRIGHTWOOD INFRASTRUCTURE IMPROVEMENTS SOUTHERLY SEGMENT- AMTRAK OVERPASS TO HOOKER STREET |
Hwy Reconstr - Restr and Rehab |
DESIGN |
|
| 604450 |
NORTHAMPTON-TRAFFIC SIGNAL IMPROVEMENTS, ROUTE 9 (BRIDGE STREET) AT I-91, EXIT 19 SB ENTRANCE RAMP |
Traffic Signals |
DESIGN |
|
| 604452 |
NORTHAMPTON- SIGNAL & INTERSECTION IMPROVEMENTS AT ROUTE 66 (WEST STREET) & EARLE STREET |
Traffic Signals |
DESIGN |
|
| 604464 |
EASTHAMPTON- BRIDGE REPLACEMENT, E-05-019, HENDRICK STREET OVER BROAD BROOK |
Bridge Replacement |
DESIGN |
|
| 604468 |
WEST BROOKFIELD- BRIDGE REPLACEMENT, W-19-008, WICKABOAG VALLEY ROAD OVER SUCKER BROOK |
Bridge Replacement |
DESIGN |
|
| 604491 |
BERNARDSTON- GREENFIELD- DEERFIELD- HATFIELD- NORTHAMPTON- HOLYOKE- I-91 WILDFLOWER MEADOW ESTABLISHMENT |
Contract Highway Maintenance |
DESIGN |
|
| 604492 |
ROYALSTON- BRIDGE REPLACEMENT, R-12-001, STOCKWELL ROAD OVER LAWRENCE BROOK |
Bridge Replacement |
DESIGN |
|
| 604515 |
ROYALSTON- BRIDGE REPLACEMENT, R-12-006, NORTH FITZWILLIAM ROAD OVER LAWRENCE BROOK |
Bridge Reconstruction/Rehab |
DESIGN |
|
| 604580 |
DISTRICT 2- SOLID WASTE REMOVAL FROM MHD DEPOTS |
Process/Recycle/Trnsprt Soils |
DESIGN |
|
| 604597 |
NORTHAMPTON- I-91 RAMPS AT EXIT 19 (DESIGN ONLY) |
New Construction |
DESIGN |
|
| 604601 |
WESTFIELD- CONSTRUCTION OF WESTFIELD STATE COLLEGE WESTERN AVENUE / ROUTE 20 (CONNECTOR ROAD) |
New Construction |
DESIGN |
|
| 604603 |
SPRINGFIELD- IMPROVEMENTS AT COURT STREET AND PYNCHON STREET (SYMPHONY HALL IMPROVEMENTS) |
Hwy Reconstr - Restr and Rehab |
DESIGN |
2010 |
| 604605 |
HOLYOKE- INTERSTATE MAINTENANCE & RELATED WORK ON I-91 |
Resurfacing |
DESIGN |
2010 |
| 604614 |
EASTHAMPTON- NORTHAMPTON- INTERSTATE MAINTENANCE & RELATED WORK ON I-91 |
Resurfacing |
DESIGN |
2013 |
| 604626 |
BELCHERTOWN- WARREN- WEST SPRINGFIELD- BRIDGE DEMOLITION, B-05-023, W-07-012, W-21-011, OLD BOSTON POST ROAD (EAST MAIN STREET/NAULTAUG BROOK) |
Demolition |
DESIGN |
|
| 604653 |
SOUTHAMPTON- REHABILITATION OF EAST STREET |
Hwy Reconstr - Restr and Rehab |
DESIGN |
|
| 604662 |
NORTHAMPTON- RENOVATIONS TO ADMINISTRATION BUILDING |
Vertical Construction (Ch 149) |
DESIGN |
|
| 604683 |
BOSTON- BRIDGE RECONSTRUCTION, B-16-196, MORRISSEY BOULEVARD OVER MOUNT VERNON STREET (AKA - LECH WALESA BRIDGE) & REHAB OF N-09-003 (AKA PATTEN'S COVE) DCR |
Bridge Reconstruction/Rehab |
DESIGN |
|
| 604692 |
BELCHERTOWN- RECONSTRUCTION ON SOUTH MAIN STREET & NORTH WASHINGTON STREET |
Hwy. Reconstr - Minor Widening |
DESIGN |
|
| 604696 |
MONTAGUE- RECONSTRUCTION OF HATCHERY ROAD |
Hwy. Reconstr - Minor Widening |
DESIGN |
|
| 604737 |
WEST SPRINGFIELD- RECONSTRUCTION ON WESTFIELD STREET (ROUTE 20) |
Hwy Reconstr - Added Capacity |
DESIGN |
2011 |
| 604738 |
SOUTHAMPTON- RECONSTRUCTION OF GLENDALE ROAD (PHASE II) |
Hwy Reconstr-No Added Capacity |
DESIGN |
|
| 604739 |
WEST BROOKFIELD- RECONSTRUCTION ON ROUTE 9, ROUTE 67 & INTERSECTIONS AT SCHOOL STREET |
Hwy Reconstr-No Added Capacity |
DESIGN |
2012 |
| 604746 |
WEST SPRINGFIELD- BRIDGE REPLACEMENT, W-21-006, CSX RAILROAD OVER UNION STREET |
Bridge Replacement |
DESIGN |
|
| 604803 |
BARRE- BRIDGE REPLACEMENT, B-02-008, STATE ROUTE 32 (MAIN STREET) OVER THE WARE CANAL |
Bridge Replacement |
DESIGN |
|
| 604818 |
ERVING- RECONSTRUCTION OF ROUTE 2 (ERVING CENTER) |
Hwy Reconstr-No Added Capacity |
DESIGN |
|
| 604819 |
BELCHERTOWN- GRANBY- RESURFACING & RELATED WORK ON ROUTE 202 |
Resurfacing |
DESIGN |
|
| 604820 |
NORTHFIELD- RECONSTRUCTION & IMPROVEMENTS ON MAIN STREET, ROUTES 10 & 63 (PHASE II) |
Hwy Reconstr - Restr and Rehab |
DESIGN |
|
| 604821 |
SPRINGFIELD- IMPROVEMENTS & SIGNALIZATION AT ALLEN STREET/BICENTENNIAL HIGHWAY |
Hwy. Reconstr - Minor Widening |
DESIGN |
2012 |
| 604838 |
WINCHENDON- BRIDGE REPLACEMENT, W-39-001, HARRIS ROAD OVER TARBELL BROOK |
Bridge Replacement |
DESIGN |
|
| 604859 |
GREENFIELD- LIGHTING UPGRADE & IMPROVEMENTS @ I-91/ROUTE 2/ROUTE 2A ROTARY |
Lighting and Electrical |
DESIGN |
|
| 604881 |
ORANGE- BRIDGE REPLACEMENT, 0-03-015, BROOKSIDE ROAD OVER PAN AM RAILWAYS (B&M RR) |
Bridge Replacement |
DESIGN |
|
| 604912 |
ATHOL- BRIDGE PRESERVATION, A-15-033, A-15-034, ROUTE 2 OVER SOUTH ATHOL & WHITE POND ROAD |
Structures Maintenance |
DESIGN |
|
| 604917 |
TEMPLETON- RECONSTRUCTION OF BALDWINVILLE ROAD, FROM ROUTE 202/68 TO PATRIOTS ROAD (APPROX. 3 MILES) |
Hwy. Reconstr - Minor Widening |
DESIGN |
2011 |
| 604959 |
ERVING- RECONSTRUCTION & IMPROVEMENTS ON ROUTE 2 (FARLEY AREA) |
Hwy Reconstr-No Added Capacity |
DESIGN |
|
| 604962 |
HOLLAND- RESURFACING & RELATED WORK ON BRIMFIELD ROAD, FROM THE BRIMFIELD/HOLLAND T.L. TO THE INTERSECTION OF STAFFORD STREET |
Hwy Reconstr-No Added Capacity |
DESIGN |
|
| 604967 |
WESTFIELD- COLUMBIA GREENWAY RAIL TRAIL CONSTRUCTION, SOUTH SECTION - FROM THE SOUTHWICK T.L. TO COLUMBIA MFG SPUR, 1.66M INCLUDES REHAB OF W-25-041 (LITTLE RIVER) & W-25-042 (SOUTH MEADOW) |
Bikeway/Bike Path Construction |
DESIGN |
|
| 604968 |
WESTFIELD- COLUMBIA GREENWAY RAIL TRAIL CONSTRUCTION, NORTH SECTION - FROM COWLES COURT ACCESS RAMPS TO THE WESTFIELD RIVER BRIDGE INCLUDES REHAB OF W-25-036 (WESTFIELD RIVER CROSSING) |
Bikeway/Bike Path Construction |
DESIGN |
2010 |
| 605011 |
LUDLOW- RECONSTRUCTION OF CENTER STREET (ROUTE 21) |
Hwy Reconstr - Added Capacity |
DESIGN |
|
| 605032 |
HADLEY- RECONSTRUCTION ON ROUTE 9 NEAR HAMPSHIRE MALL |
Hwy Reconstr - Added Capacity |
DESIGN |
|
| 605035 |
NEW BRAINTREE- RECONSTRUCTION & IMPROVEMENTS ON RAVINE ROAD AND HARDWICK ROAD |
Resurfacing |
DESIGN |
|
| 605036 |
GILL- GREENFIELD- IMPROVEMENTS & UPGRADES ON ROUTE 2 |
Hwy Reconstr-No Added Capacity |
DESIGN |
|
| 605048 |
NORTHAMPTON- IMPROVEMENTS ON ROUTE 5 (MOUNT TOM ROAD) |
Hwy. Reconstr - Minor Widening |
DESIGN |
|
| 605065 |
AMHERST- BELCHERTOWN- HADLEY NORTHAMPTON- NORWOTTUCK RAIL TRAIL IMPROVEMENTS |
Bikeway/Bike Path Construction |
DESIGN |
2010 |
| 605076 |
PHILLIPSTON- BRIDGE BETTERMENT, P-09-005, HIGHLAND AVENUE OVER ROUTE 202/ROUTE 2 |
Structures Maintenance |
DESIGN |
2010 |
| 605084 |
BARRE- BRIDGE REPLACEMENT, B-02-005, ROUTE 122 OVER PRINCE RIVER |
Bridge Replacement |
DESIGN |
2011 |
| 605119 |
WENDELL -ATHOL- ORANGE- PHILLIPSTON- TEMPLETON- TRAFFIC SIGN REPLACEMENT & RELATED WORK ON ROUTE 2 |
Sign Installation/Upgrading |
DESIGN |
|
| 605126 |
WARE- BRIDGE DECK REPLACEMENT, W-05-015, ROUTE 32 (PALMER ROAD) OVER THE WARE RIVER |
Structures Maintenance |
DESIGN |
|
| 605143 |
NORTHAMPTON- DRAINAGE SYSTEM REPAIRS & SLOPE STABILIZATION AT OLD WATER STREET |
Landscape and Roadside Develop |
DESIGN |
|
| 605144 |
DISTRICT 2- SIDEWALK & WHEELCHAIR RAMP CONSTRUCTION AT VARIOUS LOCATIONS |
Landscape and Roadside Develop |
DESIGN |
|
| 605174 |
GRANBY- SETTLEMENT AGREEMENT TO COVER COSTS ASSOCIATED WITH CONTAMINATION OF A PRIVATE WATER SUPPLY |
Posted Proposal |
DESIGN |
|
| 605213 |
SPRINGFIELD- WILBRAHAM- RECONSTRUCTION OF BOSTON ROAD (ROUTE 20) |
Hwy. Reconstr - Minor Widening |
DESIGN |
|
| 605217 |
MONTAGUE- PEDESTRIAN/BIKE ROUNDABOUT CONSTRUCTION, GREENFIELD ROAD BRIDGE OVER B&M RAILROAD |
New Bridge |
DESIGN |
|
| 605260 |
CHICOPEE- SOUTH HADLEY- RESURFACING & RELATED WORK ON ROUTE 33 (MEMORIAL DRIVE) |
Resurfacing |
DESIGN |
2010 |
| 605353 |
WEST SPRINGFIELD- SUPERSTRUCTURE REPLACEMENT, W-21-025, SR 147 (WB/EB) (MEMORIAL AVENUE) OVER (US 5) RIVERDALE STREET |
Bridge Reconstruction/Rehab |
DESIGN |
|
| 605384 |
AGAWAM- WEST SPRINGFIELD- BRIDGE RECONSTRUCTION, A-05-002=W-21-014, ROUTE 147 OVER THE WESTFIELD RIVER & INTERSECTION & SIGNAL IMPROVEMENTS @ 3 LOCATIONS |
Bridge Reconstruction/Rehab |
DESIGN |
|
| 605385 |
SPRINGFIELD- SIGNAL & INTERSECTION IMPROVEMENTS @ ROOSEVELT AVENUE & ISLAND POND ROAD, ROOSEVELT AVENUE & ALDEN STREET |
Hwy. Reconstr - Minor Widening |
DESIGN |
|
| 605417 |
SPRINGFIELD- WEST SPRINGFIELD- BRIDGE PRESERVATION ON I-91 CORRIDOR: S-24-042, S-24-079, S-24-085, S-24-087, W-21-037, W-21-042 |
Bridge Reconstruction/Rehab |
DESIGN |
|
| 605442 |
LONGMEADOW- WEST SPRINGFIELD- GUIDE & TRAFFIC SIGN REPLACEMENT ON I-91 |
Structural Signing |
DESIGN |
|
| 605454 |
DISTRICT 2- INTERSTATE BRIDGE PAINTING (ABP-BP1) |
Painting - Structural |
DESIGN |
|
| 605459 |
CHESTER- HINSDALE- RICHMOND- WEST SPRINGFIELD- BRIDGE RECONSTRUCTION, C-11-002, C-11-008, H-16-013, H-16-014, R-06-001 & W-21-008 (CSX DESIGN/BUILD - ABP-CSX1) |
Bridge Reconstruction/Rehab |
DESIGN |
|
| 605461 |
BROOKFIELD- CHARLTON- SPENCER- WEST BROOKFIELD- WESTBOROUGH- WORCESTER- BRIDGE RECONSTRUCTION,
B-26-003, C-06-013, C-06-014, S-23-024, W-19-015, W-24-007 & W-44-022 (CSX DESIGN/BUILD - ABP-CSX3) |
Bridge Reconstruction/Rehab |
DESIGN |
|
| 605469 |
DISTRICT 2- SCHEDULED AND EMERGENCY BRIDGE STRUCTURAL REPAIRS AT VARIOUS LOCATIONS (ABP) |
Structures Maintenance |
DESIGN |
|
| 605529 |
PALMER- BRIDGE RECONSTRUCTION, P-01-024, PARK STREET (ROUTE 20) OVER CSX RR & BOSTON ROAD (ROUTE 67 NB) INCLUDING DEMOLITION |
Bridge Replacement |
DESIGN |
|
| 605556 |
BELCHERTOWN- SIGNAL & INTERSECTION IMPROVEMENTS AT MAIN STREET (ROUTE 181), MAPLE STREET (RTE 202), JABISH STREET (ROUTE 21) |
Traffic Signals |
DESIGN |
|
| 605559 |
WARREN- RESURFACING & INTERSECTION IMPROVEMENTS AT ROUTE 67 & ROUTE 19 (WARREN TOWN CENTER) |
Resurfacing |
DESIGN |
|
| 605569 |
SPRINGFIELD- RECONSTRUCTION OF EDWARDS STREET & ELLIOT STREET |
Hwy Reconstr - Restr and Rehab |
DESIGN |
2010 |
| 605587 |
WEST SPRINGFIELD- INTERSTATE MAINTENANCE & RELATED WORK ON I-91 |
Resurfacing |
DESIGN |
2011 |
| 605592 |
STURBRIDGE- HOLLAND- INTERSTATE MAINTENANCE & RELATED WORK ON I-84 |
Resurfacing |
DESIGN |
2013 |
| 605594 |
HOLYOKE- WEST SPRINGFIELD- INTERSTATE MAINTENANCE & RELATED WORK ON I-91 (SB) |
Resurfacing |
DESIGN |
2012 |
| 605595 |
DEERFIELD- GREENFIELD- INTERSTATE MAINTENANCE & RELATED WORK ON I-91 |
Resurfacing |
DESIGN |
2013 |
| 605617 |
NORTHAMPTON- CULVERT REPAIR ON I-91 |
Structures Maintenance |
DESIGN |
|
| 605618 |
LUDLOW- WILBRAHAM- BRIDGE REHABILITATION, L-16-002=W-35-002, EAST STREET OVER THE CHICOPEE RIVER |
Bridge Reconstruction/Rehab |
DESIGN |
|
| 605620 |
DISTRICT 2- REPAIR OF FABRIC SALT STORAGE SHEDS AT VARIOUS LOCATIONS |
Chemical Storage Sheds |
DESIGN |
|
| 605643 |
HOLYOKE- RESURFACING & RELATED WORK ON WESTFIELD ROAD (ROUTE 202), FROM ASHLEY ROAD TO OLD COUNTY ROAD |
Resurfacing |
DESIGN |
2010 |
| 605648 |
AMHERST- RESURFACING & RELATED WORK ON ROUTE 116 |
Resurfacing |
DESIGN |
2010 |
| 605669 |
WALES - RECONSTRUCTION & RELATED WORK ON ROUTE 19 |
Hwy Reconstr - Restr and Rehab |
DESIGN |
|
| 605673 |
SOUTH HADLEY- RESURFACING & RELATED WORK ON HADLEY STREET (ROUTE 47) |
Resurfacing |
DESIGN |
2010 |
| 605676 |
BELCHERTOWN- RESURFACING & RELATED WORK ON A SECTION OF BAY ROAD |
Resurfacing |
DESIGN |
|
| 605682 |
GRANBY- RESURFACING & RELATED WORK AMHERST STREET |
Resurfacing |
DESIGN |
|
| 605683 |
SPRINGFIELD- RESURFACING & RELATED WORK ON PLUMTREE ROAD |
Resurfacing |
DESIGN |
|
| 605685 |
SPRINGFIELD- SIGNAL & INTERSECTION IMPROVEMENTS AT SUMNER AVENUE, ALLEN STREET, ABBOT STREET & HARKNESS AVENUE |
Traffic Signals |
DESIGN |
|
| 605687 |
MONSON- RECONSTRUCTION OF LOWER HAMPDEN ROAD (PHASE II) |
Hwy Reconstr - Restr and Rehab |
DESIGN |
|
| 605710 |
HARDWICK- RESURFACING & RELATED WORK ON ROUTE 32, FROM 3,000 FT EAST OF ROUTE 32A TO BARRE T.L. |
Resurfacing |
DESIGN |
2010 |
| 605718 |
DISTRICT 2- ROADWAY REPAIRS AT VARIOUS LOCATIONS |
Contract Highway Maintenance |
DESIGN |
|
| 605728 |
EASTHAMPTON- RAIL-TRAIL & BRIDGE CONSTRUCTION, E-05-028, MANHAN RAIL TRAIL OVER THE MANHAN RIVER |
New Bridge |
DESIGN |
2010 |
| 605751 |
DISTRICT 2- RESURFACING AT GRANBY & WARE MAINTENANCE FACILITIES |
Resurfacing |
DESIGN |
|
| 605760 |
SOUTH HADLEY- REHABILITATION OF MORGAN STREET, FROM COLLEGE STREET (ROUTE 116) TO GRANBY T.L. |
Resurfacing |
DESIGN |
|
| 605785 |
ATHOL- CONSTRUCTION OF A PRE-ENGINEERED STEEL STORAGE FACILITY AT MASSDOT MAINTENANCE DEPOT OFF ROUTE 32 (PETERSHAM ROAD) |
Vertical Construction (Ch 149) |
DESIGN |
|
| 605801 |
DISTRICT 2- BUILDING CONSTRUCTION & SITE IMPROVEMENTS AT NORTHAMPTON FACILITY |
Vertical Construction (Ch 149) |
DESIGN |
|
| 605803 |
BERNARDSTON- BRIDGE REPLACEMENT, B-10-026, ROUTE 5 & 10 OVER TRIBUTARY OF THE FALLS RIVER |
Hwy Reconstr-No Added Capacity |
DESIGN |
|
| 605804 |
DISTRICT 2- CATCH BASIN CLEANING AT VARIOUS LOCATIONS |
Catch Basin Cleaning |
DESIGN |
|
| 605808 |
DISTRICT 2- TREE TRIMMING & SIGHT DISTANCE CLEARANCE AT VARIOUS LOCATIONS |
Contract Highway Maintenance |
DESIGN |
|
| 605810 |
DISTRICT 2- HIGHWAY CLEANING ON
SECTIONS OF I-91 & I-291 -GREATER SPRINGFIELD AREA |
Highway Sweeping |
DESIGN |
|
| 605812 |
DISTRICT 2- TRAFFIC MANAGEMENT AT VARIOUS LOCATIONS |
Miscellaneous/No Prequal |
DESIGN |
|
| 605814 |
SPRINGFIELD- LIGHTING UPGRADES ON ROUTE I-91, FROM THE SOUTH END BRIDGE (ROUTE 5) TO STATE STREET |
Lighting and Electrical |
DESIGN |
|
| 605815 |
WESTHAMPTON- RESURFACING & RELATED WORK ON ROUTE 66 |
Hwy Reconstr-No Added Capacity |
DESIGN |
|
| 605817 |
SPRINGFIELD- RECONSTRUCTION OF EDWARDS STREET, SPRING STREET & ELLIOT STREET |
Hwy Reconstr - Restr and Rehab |
DESIGN |
|
| 605818 |
NORTHFIELD- BRIDGE DEMOLITION, N-22-002 (SCHELL BRIDGE) OVER THE CONNECTICUT RIVER |
Demolition |
DESIGN |
|
| 605833 |
WEST SPRINGFIELD- HOLYOKE- EASTHAMPTON- NORTHAMPTON- HATFIELD- WHATELY- DEERFIELD- GREENFIELD- BERNARDSTON- GUIDE & TRAFFIC SIGN REPLACEMENT ON I-91 |
Structural Signing |
DESIGN |
|
| 605835 |
DISTRICT 2- CLEANING & SEALING PAVEMENT CRACKS AT VARIOUS LOCATIONS |
Crack Sealing |
DESIGN |
|
| 605841 |
PETERSHAM- RESURFACING & RELATED WORK ON ROUTE 32, FROM BARRE T.L. TO ROUTE 101 |
Resurfacing |
DESIGN |
2013 |
| 605849 |
WESTFIELD- RESTORATION & SITE IMPROVEMENTS ON DEPOT ACCESS ROAD |
Hwy Reconstr - Restr and Rehab |
DESIGN |
|
| 605881 |
HADLEY- RECONSTRUCTION ON ROUTE 9, FROM MIDDLE STREET (ROUTE 47) TO EAST OF MILL VALLEY ROAD (LOWE'S) |
Hwy Reconstr - Added Capacity |
DESIGN |
|
| 605891 |
EASTHAMPTON- HOLYOKE- RESURFACING & RELATED WORK ON ROUTE 5 |
Resurfacing |
DESIGN |
|
| 605896 |
NORTHAMPTON- RESURFACING & RELATED WORK ON ROUTE 5, FROM I-91 (NB ON-RAMP) TO HOLYOKE STREET |
Resurfacing |
DESIGN |
|
| 605977 |
WESTFIELD- RUSSELL- MONTGOMERY- BRIDGE CLEANING & PAINTING, M-30-008, I-90 OVER THE WESTFIELD RIVER |
Painting - Structural |
DESIGN |
|
| 605980 |
PALMER- WESTON- SCHEDULED & EMERGENCY BRIDGE REPAIRS AT VARIOUS LOCATIONS |
Structures Maintenance |
DESIGN |
|
| 605986 |
WESTFIELD- CHICOPEE- WEST SPRINGFIELD- RESURFACING & RELATED WORK |
Resurfacing |
DESIGN |
|
| 605987 |
LUDLOW- PALMER- STURBRIDGE- RESURFACING & RELATED WORK AT INTERCHANGES 7, 8 & 9 ON I-90 |
Resurfacing |
DESIGN |
|
| 605999 |
BRIMFIELD- STURBRIGE- WARREN- RESURFACING & RELATED WORK ON I-90 |
Resurfacing |
DESIGN |
|
| 606037 |
DISTRICT 2- EMERGENCY REPAIRS TO TRAFFIC SIGNALS
|
Traffic Signals |
DESIGN |
|
| 8055 |
TEMPLETON- BRIDGE REPLACEMENT, BR# T-02-009 BRIDGE STREET OVER THE B & M RAILROAD |
Bridge Replacement |
COMPLETE |
|
| 30512 |
MONSON- BRIDGE REPLACEMENT, BR# M-27-012 HOVEY ROAD OVER CONRAIL |
Bridge Replacement |
COMPLETE |
|
| 36575 |
WESTHAMPTON- BRIDGE REPLACEMENT, BR# W-27-006 KINGS HIGHWAY OVER THE NORTH BRANCH OF THE MANHAN RIVER |
Bridge Replacement |
COMPLETE |
|
| 45390 |
SPRINGFIELD- WEST SPRINGFIELD- BRIDGE REHABILITATION, BR# S-24-030=W-21-001 ROUTE 147 OVER THE CONNECTICUT RIVER & AMTRAK |
Bridge Reconstruction/Rehab |
COMPLETE |
|
| 45615 |
GREENFIELD- BRIDGE REPLACEMENT, BR# G-12-021 ALLEN STREET OVER THE B & M RAILROAD |
Bridge Replacement |
COMPLETE |
|
| 78405 |
EASTHAMPTON- TEMPORARY BRIDGE, BR# E-05-004 ROUTE 5 OVER THE MANHAN RIVER |
Bridge Replacement |
COMPLETE |
|
| 78406 |
EASTHAMPTON- BRIDGE REPLACEMENT, BR# E-05-004 ROUTE 5 OVER THE MANHAN RIVER |
Bridge Replacement |
COMPLETE |
|
| 115299 |
AGAWAM- SOUTHWICK- BUILDING DEMOLITION FOR PROPOSED ROUTE 57 (PHASE II) |
Vertical Construction (Ch 149) |
COMPLETE |
|
| 119005 |
NORTHAMPTON- ROADWAY RECONSTRUCTION INCLUDING 2 BRIDGE REHABILITATIONS AND SIGNALS ON A SECTION OF ROUTE 66 (PHASE 1) |
Hwy Reconstr-No Added Capacity |
COMPLETE |
|
| 119006 |
NORTHAMPTON- ROADWAY RECONSTRUCTION AND RELATED WORK ON A SECTION OF ROUTE 66 (PHASE 2) |
Hwy Reconstr-No Added Capacity |
COMPLETE |
|
| 119007 |
NORTHAMPTON- RECONSTRUCTION OF ROUTE 66, FROM WILSON ROAD TO LOUDVILLE ROAD (4 MILES) INCLUDES N-19-038 (PHASE III) |
Hwy Reconstr-No Added Capacity |
COMPLETE |
|
| 124911 |
HADLEY- NORTHAMPTON- INSTALLATION OF ADVANCED TRAFFIC MANAGEMENT SYSTEM, BR# H-01-012=N-19-018 ROUTE 9 OVER CONNECTICUT RIVER |
Traffic Signals |
COMPLETE |
|
| 124913 |
HADLEY- NORTHAMPTON- BRIDGE REHABILITATION, BR# H-01-012=N-19-018 ROUTE 9 OVER THE CONNECTICUT RIVER (CALVIN COOLIDGE BRIDGE) |
Bridge Reconstruction/Rehab |
COMPLETE |
|
| 127700 |
NORTHFIELD- BRIDGE DEMOLITION, N-22-002, EAST/WEST NORTHFIELD ROAD (SCHELL BRIDGE) OVER THE CONNECTICUT RIVER |
Demolition |
COMPLETE |
|
| 128920 |
CHICOPEE- ROADWAY RECONSTRUCTION ON A SECTION OF SHAWINIGAN DRIVE |
Hwy. Reconstr - Minor Widening |
COMPLETE |
|
| 180085 |
NORTHAMPTON- REPAIRS TO HEATING SYSTEM AT DISTRICT 2 MAINTENANCE FACILITY |
Vertical Construction (Ch 149) |
COMPLETE |
|
| 600130 |
SPRINGFIELD- BRIDGE REPAIRS ON INTERSTATE 91 AT SPRINGFIELD VIADUCT (P.V. CHANGE) |
Bridge Reconstruction/Rehab |
COMPLETE |
|
| 600460 |
SPRINGFIELD- ROADWAY RECONSTRUCTION INCLUDING SIGNALS ON A SECTION OF BOSTON ROAD |
Hwy Reconstr-No Added Capacity |
COMPLETE |
|
| 600583 |
LONGMEADOW- SPRINGFIELD- HIGHWAY LIGHTING UPGRADES ON ROUTE I-91 FROM CONN. S.L. TO SOUTH END BRIDGE |
Safety Improvements |
COMPLETE |
|
| 600587 |
AGAWAM- BRIDGE REHABILITATION, BR# A-05-017 ROUTE 57 OVER ROUTE 159 (MAIN STREET) |
Bridge Reconstruction/Rehab |
COMPLETE |
|
| 600617 |
BELCHERTOWN- WARE- BRIDGE REPLACEMENT, BR# B-05-025=W-05-014 COLD SPRING ROAD OVER THE SWIFT RIVER |
Bridge Replacement |
COMPLETE |
|
| 600620 |
MONTAGUE- BRIDGE REPLACEMENTS, BR# M-28-022 SOUTH FERRY ROAD OVER SAWMILL RIVER & BR# M-28-023 MEADOW ROAD OVER SAWMILL RIVER |
Bridge Replacement |
COMPLETE |
|
| 600622 |
TEMPLETON- BRIDGE REPLACEMENT, BR# T-02-021 WINCHENDON ROAD (ROUTE 202) OVER THE B & M RAILROAD |
Bridge Replacement |
COMPLETE |
|
| 600661 |
TEMPLETON- BRIDGE REHABILITATION, BR# T-02-002 ROUTE 202 (ELM STREET) OVER THE OTTER RIVER |
Bridge Reconstruction/Rehab |
COMPLETE |
|
| 600720 |
GREENFIELD- CONSTRUCTION OF A TOURIST INFORMATION CENTER AT ROUTE I-91 AND ROUTE 2 |
Vertical Construction (Ch 149) |
COMPLETE |
|
| 600721 |
TEMPLETON- RECONSTRUCTION OF ROUTE 101 (DUDLEY/PETERSHAM ROAD) 2.1 MILES |
Hwy Reconstr - Major Widening |
COMPLETE |
|
| 600733 |
BRIMFIELD- ROADWAY RECONSTRUCTION INCLUDING BRIDGE REPLACEMENT, BR# B-24-009 MONSON ROAD OVER FOSKETT MILL STREAM |
Bridge Replacement |
COMPLETE |
|
| 600734 |
BRIMFIELD- BRIDGE REPLACEMENT, BR# B-24-025 HAYNES HILL ROAD OVER MILL BROOK |
Bridge Replacement |
COMPLETE |
|
| 600752 |
GREENFIELD- BRIDGE REPLACEMENT, BR# G-12-018 GREEN RIVER ROAD OVER HINSDALE BROOK |
Bridge Replacement |
COMPLETE |
|
| 600753 |
GREENFIELD- BRIDGE REPLACEMENT, BR# G-12-064 LOG PLAIN ROAD OVER MILL BROOK |
Bridge Replacement |
COMPLETE |
|
| 600754 |
HADLEY- BRIDGE REPLACEMENT, BR# H-01-002 MOUNT WARNER ROAD OVER THE MILL RIVER |
Bridge Replacement |
COMPLETE |
|
| 600768 |
ORANGE- WENDELL- BRIDGE REPLACEMENT, BR# O-03-010=W-15-001 WENDELL DEPOT ROAD OVER MILLERS RIVER |
Bridge Replacement |
COMPLETE |
|
| 600774 |
GARDNER- TEMPLETON- BRIDGE REPLACEMENT, BR# G-01-002=T-02-006 BRIDGE STREET/TURNER ROAD OVER THE OTTER RIVER |
Bridge Replacement |
COMPLETE |
|
| 600778 |
WESTFIELD- BRIDGE REPLACEMENT, BR# W-25-007 GRANVILLE ROAD OVER THE LITTLE RIVER |
Bridge Replacement |
COMPLETE |
|
| 600826 |
WESTFIELD- BRIDGE REHABILITATIONS, BR# W-25-003, ROUTE 20 OVER POWDER MILL BROOK AND W-25-004 ROUTE 20 OVER THE WESTFIELD RIVER |
Bridge Reconstruction/Rehab |
COMPLETE |
|
| 600830 |
AMHERST- BELCHERTOWN- CONSTRUCTION OF A BIKE PATH ALONG ABANDONED R.R. BED (EXTENSION OF NORWOTTUCK TRAIL) |
Bikeway/Bike Path Construction |
COMPLETE |
|
| 600862 |
MONTAGUE- WENDELL- BRIDGE REPLACEMENT, BR# M-28-035=W-15-010 MORMON HOLLOW ROAD/DAVIS ROAD OVER LYONS BROOK |
Bridge Replacement |
COMPLETE |
|
| 600937 |
AGAWAM- WEST SPRINGFIELD- RESURFACING, ROUTE 5 FROM SOUTH END BRIDGE TO EAST ELM STREET |
Resurfacing |
COMPLETE |
|
| 600965 |
ROYALSTON- BRIDGE REPLACEMENT, BR# R-12-015 ROUTE 68 (ROYALSTON ROAD) OVER THE MILLERS RIVER |
Bridge Replacement |
COMPLETE |
|
| 600968 |
DISTRICT 2- DRAINAGE BETTERMENTS AT VARIOUS LOCATIONS |
Miscellaneous/No Prequal |
COMPLETE |
|
| 600974 |
TEMPLETON- BRIDGE REHABILITATION, BR# T-02-014 ROUTE 68 (GARDNER ROAD) OVER THE OTTER RIVER |
Bridge Reconstruction/Rehab |
COMPLETE |
|
| 600992 |
CHICOPEE- BRIDGE REPLACEMENT, BR# C-13-011 ROUTE 141 (MONTGOMERY STREET) OVER CHICOPEE RIVER (DEADY MEMORIAL BRIDGE) PHASE II |
Bridge Replacement |
COMPLETE |
|
| 600995 |
WINCHENDON- BRIDGE REPLACEMENT, BR# W-39-021 ROUTE 12 (SPRING STREET) OVER MILLERS RIVER |
Bridge Replacement |
COMPLETE |
|
| 601149 |
SOUTH HADLEY- CONSTRUCTION OF A PRE-ENGINEERED STEEL STORAGE FACILITY ON ROUTE 33 (LYMAN ROAD) (P.V. CHANGE) |
Vertical Construction (Ch 149) |
COMPLETE |
|
| 601150 |
WEST SPRINGFIELD- CONSTRUCTION OF A PRE-ENGINEERED STEEL STORAGE FACILITY AT THE MHD MAINTENANCE DEPOT ON ASHLEY ROAD |
Vertical Construction (Ch 149) |
COMPLETE |
|
| 601151 |
BELCHERTOWN- CONSTRUCTION OF A PRE-ENGINEERED STEEL STORAGE FACILITY AT THE MHD MAINTENANCE DEPOT ON ROUTE 9 |
Vertical Construction (Ch 149) |
COMPLETE |
|
| 601155 |
BARRE- BRIDGE REHABILITATION, BR# B-02-007, ROUTE 32 (SOUTH BARRE ROAD) OVER THE WARE RIVER |
Bridge Reconstruction/Rehab |
COMPLETE |
|
| 601170 |
WILBRAHAM- ROADWAY RECONSTRUCTION AND RELATED WORK ON SPRINGFIELD AND FACULTY STREETS |
Hwy Reconstr-No Added Capacity |
COMPLETE |
|
| 601171 |
MONSON- ROADWAY RECONSTRUCTION ON A SECTION OF THOMPSON STREET |
Hwy Reconstr - Restr and Rehab |
COMPLETE |
|
| 601173 |
HADLEY- RESURFACING AND RELATED WORK ON A SECTION OF BAY ROAD |
Hwy Reconstr - Major Widening |
COMPLETE |
|
| 601174 |
SOUTHAMPTON- RESURFACING AND RELATED WORK ON POMEROY MEADOW ROAD FROM ROUTE 10 TO THE EASTHAMPTON TL |
Resurfacing |
COMPLETE |
|
| 601177 |
WARWICK- BRIDGE REPLACEMENT, W-08-004, ROUTE 78 (ORANGE ROAD) OVER ORCUTT BROOK |
Bridge Replacement |
COMPLETE |
|
| 601179 |
CHICOPEE- ROADWAY RECONSTRUCTION INCLUDING SIGNALS, ROUTE 116 (CHICOPEE STREET) FROM MEADOW STREET TO WILLMANSETT BRIDGE |
Hwy. Reconstr - Minor Widening |
COMPLETE |
|
| 601180 |
NORTHAMPTON- CONSTRUCTION OF A BIKE PATH ALONG ABANDONED RR BED (EXTENSION OF NORWOTTUCK TRAIL) |
Bikeway/Bike Path Construction |
COMPLETE |
|
| 601185 |
BERNARDSTON- BRIDGE REHABILITATION, BR# B-10-012, ROUTES 5 & 10 (SOUTH STREET) OVER B&M RR,
FAP#BR-001S(450)X |
Bridge Reconstruction/Rehab |
COMPLETE |
|
| 601200 |
NORTHAMPTON- BRIDGE REPLACEMENT, BR# N-19-068 OLD SPRINGFIELD ROAD OVER THE MILL RIVER |
Bridge Replacement |
COMPLETE |
|
| 601268 |
ERVING- MONTAGUE- BRIDGE REHABILITATION, BR# E-10-001=M-28-014 EAST MINERAL ROAD OVER THE MILLERS RIVER (CONVERSION TO PED/BIKE) |
Bridge Reconstruction/Rehab |
COMPLETE |
|
| 601270 |
WHATELY- BRIDGE REPLACEMENTS, BR# W-33-007 WESTBROOK ROAD OVER WEST BROOK & W-33-008 WESTBROOK ROAD OVER WEST BROOK |
Bridge Replacement |
COMPLETE |
|
| 601288 |
ORANGE- BRIDGE REPLACEMENT, BR# O-03-003 ROYALSTON ROAD OVER THE WEST BRANCH OF THE TULLY RIVER |
Bridge Replacement |
COMPLETE |
|
| 601329 |
WILBRAHAM- TRAFFIC SAFETY IMPROVEMENTS INCLUDING SIGNALS, ROUTE 20 (BOSTON ROAD) AT STONY HILL ROAD |
Safety Improvements |
COMPLETE |
|
| 601403 |
SPRINGFIELD- TRAFFIC SAFETY IMPROVEMENTS INCLUDING SIGNALS, 4 LOCATIONS |
Traffic Signals |
COMPLETE |
|
| 601487 |
WEST SPRINGFIELD- GEOMETRIC IMPROVEMENTS & SIGNALIZATION, KINGS HIGHWAY & ELM STREET |
Hwy Reconstr-No Added Capacity |
COMPLETE |
|
| 601501 |
CHICOPEE- ROADWAY RECONSTRUCTION ON ROUTE 141 (GRATTAN STREET) FROM ROUTE I-391 TO MONTGOMERY STREET (1.8 MILES) |
Hwy. Reconstr - Minor Widening |
COMPLETE |
|
| 601523 |
DISTRICT 2- GUARDRAIL REFURBISHMENT AND EMERGENCY REPAIRS AT VARIOUS LOCATIONS |
Guard Rail & Fencing |
COMPLETE |
|
| 601524 |
ORANGE- BRIDGE REHABILITATION, BR# O-03-008 ROUTE 122 (SOUTH MAIN STREET) OVER MILLERS RIVER |
Bridge Reconstruction/Rehab |
COMPLETE |
|
| 601561 |
SHUTESBURY- RECONSTRUCTION OF LEVERETT ROAD, COOLEYVILLE ROAD & PRESCOTT ROAD |
Hwy Reconstr-No Added Capacity |
COMPLETE |
|
| 601566 |
AMHERST- TRAFFIC SAFETY IMPROVEMENTS, ROUTE 116 (SOUTH PLEASANT STREET) AT ROUTE 9 (NORTHAMPTON ROAD & COLLEGE STREET) |
Traffic Signals |
COMPLETE |
|
| 601568 |
ERVING- MONTAGUE- BRIDGE REPLACEMENT, BR# E-10-002=M-28-004, ROUTE 63 (BRIDGE STREET) OVER MILLERS RIVER |
Bridge Reconstruction/Rehab |
COMPLETE |
|
| 601584 |
SOUTH HADLEY- RECONSTRUCTION, ROUTE 116 (COLLEGE STREET, WOODBRIDGE STREET & AMHERST ROAD) (8,700 FEET) |
Hwy. Reconstr - Minor Widening |
COMPLETE |
|
| 601602 |
EAST LONGMEADOW- BRIDGE REMOVAL AND ROADWAY RECONSTRUCTION, BR# E-03-001 ROUTE 83 (N. MAIN STREET) OVER ABANDONED CONRAIL |
Demolition |
COMPLETE |
|
| 601624 |
BRIMFIELD- BRIDGE REHABILITATION, BR# B-24-018 WASHINGTON STREET OVER CONRAIL |
Bridge Reconstruction/Rehab |
COMPLETE |
|
| 601660 |
ORANGE- RESURFACING AND RELATED WORK ON A SECTION OF WEST RIVER STREET |
Resurfacing |
COMPLETE |
|
| 601661 |
AMHERST- TRAFFIC SAFETY IMPROVEMENTS INCLUDING SIGNALS, ROUTE 116 (PLEASANT STREET) AT MAIN STREET AND AMITY STREET |
Traffic Signals |
COMPLETE |
|
| 601674 |
AMHERST- HADLEY- RESURFACING AND RELATED WORK ON A SECTION OF ROUTE 9 (NORTHAMPTON ROAD & RUSSELL STREET) |
Resurfacing |
COMPLETE |
|
| 601681 |
DISTRICT 2- DRAINAGE BETTERMENT AND CULVERT REPAIR AT VARIOUS LOCATIONS |
Miscellaneous/No Prequal |
COMPLETE |
|
| 601684 |
CHICOPEE- HOLYOKE- RESURFACING & RELATED WORK, ROUTE I-391 FROM MAIN STREET (HOLYOKE) TO ROUTE I-91 (4.1 MILES) |
Resurfacing |
COMPLETE |
|
| 601728 |
MONSON- ROADWAY RECONSTRUCTION ON WALES ROAD FROM MOULTON HILL ROAD TO THE WALES T.L. |
Hwy Reconstr - Major Widening |
COMPLETE |
|
| 601769 |
WHATELY- RESURFACING AND RELATED WORK ON A SECTION OF CHRISTIAN LANE |
Resurfacing |
COMPLETE |
|
| 601794 |
GREENFIELD- RESURFACING AND RELATED WORK ON THE ROUTE 2 AND ROUTE I-91 CONNECTORS |
Resurfacing |
COMPLETE |
|
| 601808 |
SOUTHAMPTON- ROAD RECONSTRUCTION, GLENDALE ROAD FROM POMEROY MEADOW ROAD TO EASTHAMPTON T.L. (1.7 MI) |
Hwy Reconstr-No Added Capacity |
COMPLETE |
|
| 601815 |
GREENFIELD- BRIDGE REHABILITATION, BR# G-12-058 ROUTE I-91 NORTHBOUND & SOUTHBOUND OVER THE B&M RAILROAD |
Bridge Reconstruction/Rehab |
COMPLETE |
|
| 601816 |
WEST SPRINGFIELD- SIGNAL UPGRADING, 2 LOCATIONS, WESTFIELD ST. AT SECOND STREET AND WESTFIELD ST. AT CHESTNUT ST. |
Traffic Signals |
COMPLETE |
|
| 601835 |
DISTRICT 2- RESTORATION OF SALT SHEDS IN VARIOUS MAINTENANCE DEPOTS |
Chemical Storage Sheds |
COMPLETE |
|
| 601874 |
SPRINGFIELD- RESURFACING AND RELATED WORK ON A SECTION OF PARKER STREET |
Resurfacing |
COMPLETE |
|
| 601904 |
BELCHERTOWN- RESURFACING AND RELATED WORK ON A SECTION OF ROUTE 9 |
Resurfacing |
COMPLETE |
|
| 601949 |
BARRE- RESURFACING AND RELATED WORK, ROUTE 122 (WORCESTER ROAD) |
Resurfacing |
COMPLETE |
|
| 602002 |
DISTRICT 2- REPLACEMENT OF GUARDRAIL TERMINAL ENDS ON INTERSTATE 91 (CONNECTICUT S.L. TO VERMONT S.L.) |
Guard Rail & Fencing |
COMPLETE |
|
| 602006 |
CHICOPEE- STORM DRAIN REPAIRS ALONG ROUTE I-391 AT CHICOPEE STREET |
Miscellaneous/No Prequal |
COMPLETE |
|
| 602029 |
DISTRICT 2- TRAFFIC SIGNAL BETTERMENT, VARIOUS LOCATIONS (5 SEPARATE CONTRACTS) |
Traffic Signals |
COMPLETE |
|
| 602035 |
CHICOPEE- HOLYOKE- TRAFFIC SIGN REPLACEMENT AND UPDATING ON ROUTE I-391 |
Sign Installation/Upgrading |
COMPLETE |
|
| 602039 |
SPRINGFIELD- WEST SPRINGFIELD- CLEAN & PAINT 4 (FOUR) STEEL BRIDGES, ROUTE I-91 (SPRINGFIELD) & ROUTE 147 (WEST SPRINGFIELD) |
Painting - Structural |
COMPLETE |
|
| 602040 |
AGAWAM- BERNARDSTON- SPRINGFIELD- WEST SPRINGFIELD- SAFETY & VISUAL IMPROVEMENTS, ROUTES 5, 57, I-91 & I-291 |
Safety Improvements |
COMPLETE |
|
| 602043 |
NORTHAMPTON- CONSTRUCTION OF PARK AND RIDE FACILITY AT SHELDON FIELD OFF OLD FERRY ROAD AND BRIDGE STREET (ROUTE 9) |
New Construction |
COMPLETE |
|
| 602058 |
NORTHAMPTON- BRIDGE REPLACEMENT, BR# N-19-033 CHESTERFIELD ROAD OVER ROBERTS MEADOW BROOK |
Bridge Replacement |
COMPLETE |
|
| 602062 |
SPRINGFIELD- CLEAN AND PAINT STEEL BRIDGES AT 4 LOCATIONS OVER ROUTE I-291 & CSX RAILROAD |
Painting - Structural |
COMPLETE |
|
| 602069 |
HATFIELD- NORTHAMPTON- WHATELY- RESURFACING AND RELATED WORK ON SECTIONS OF ROUTE 5/10 |
Resurfacing |
COMPLETE |
|
| 602075 |
BELCHERTOWN- TRAFFIC SAFETY IMPROVEMENTS INCLUDING SIGNALS ON SECTIONS OF MAIN, MAPLE & JABISH STREETS |
Safety Improvements |
COMPLETE |
|
| 602108 |
EASTHAMPTON- TRAFFIC SAFETY IMPROVEMENTS INCLUDING SIGNALS, ROUTE 141 (UNION/COTTAGE STREETS) AT PAYSON AVENUE |
Safety Improvements |
COMPLETE |
|
| 602112 |
DISTRICT 2- APPLICATION OF REFLECTORIZED THERMOPLASTIC PAVEMENT MARKINGS ON VARIOUS STATE HIGHWAYS (5 SEPARATE CONTRACTS) |
Pavement Marking |
COMPLETE |
|
| 602121 |
AMHERST- TRAFFIC SAFETY IMPROVEMENTS INCLUDING SIGNALS, ROUTE 9 (BELCHERTOWN ROAD) AT OLD FARM ROAD AND GATEHOUSE ROAD |
Safety Improvements |
COMPLETE |
|
| 602128 |
DISTRICT 2- SCHEDULED AND EMERGENCY REPAIR OF BRIDGE JOINTS AT VARIOUS LOCATIONS |
Structures Maintenance |
COMPLETE |
|
| 602151 |
ATHOL- RECONSTRUCTION AND SAFETY IMPROVEMENTS, ROUTE 2A/ROUTE 32 (MAIN STREET) |
Hwy Reconstr-No Added Capacity |
COMPLETE |
|
| 602175 |
DISTRICT 2- EMERGENCY REPAIRS TO TRAFFIC SIGNALS AT VARIOUS LOCATIONS |
Traffic Signals |
COMPLETE |
|
| 602221 |
DISTRICT 2- CRACK SEALING ON PAVEMENT AT VARIOUS LOCATIONS |
Crack Sealing |
COMPLETE |
|
| 602222 |
DISTRICT 2- RECONSTRUCTION OF DRAINAGE STRUCTURES ON VARIOUS STATE HIGHWAYS |
Miscellaneous/No Prequal |
COMPLETE |
|
| 602241 |
BERNARDSTON- RESURFACING & RELATED WORK ON ROUTE 5 & 10 |
Resurfacing |
COMPLETE |
|
| 602274 |
SUNDERLAND- TRAFFIC SAFETY IMPROVEMENTS INCLUDING SIGNALS, ROUTE 47 (MAIN STREET) AT ROUTE 116 (BRIDGE STREET) |
Traffic Signals |
COMPLETE |
|
| 602335 |
PALMER- WILBRAHAM- RESURFACING AND RELATED WORK ON A SECTION OF ROUTE 20 |
Resurfacing |
COMPLETE |
|
| 602357 |
HARDWICK- ROADWAY RECONSTRUCTION AND RELATED WORK ON ROUTE 32A (PETERSHAM ROAD) |
Hwy Reconstr - Added Capacity |
COMPLETE |
|
| 602358 |
GILL- RECONSTRUCTIO OF MAIN ROAD, FROM NORTHFIELD TL SOUTHERLY TO WOOD AVENUE |
Hwy. Reconstr - Minor Widening |
COMPLETE |
|
| 602380 |
SPRINGFIELD- TRAFFIC SAFETY IMPROVEMENTS, ROUTE 20 (PAGE BOULEVARD) AT CADWELL DRIVE AND ROBBINS ROAD |
Safety Improvements |
COMPLETE |
|
| 602411 |
DISTRICT 1- FABRICATION AND INSTALLATION OF SIGNS & SUPPORTS ON VARIOUS STATE HIGHWAYS (5 SEPARATE CONTRACTS) |
Structural Signing |
COMPLETE |
|
| 602412 |
DISTRICT 2- FABRICATION AND INSTALLATION OF SIGNS & SUPPORTS ON VARIOUS STATE HIGHWAYS (5 SEPARATE CONTRACTS) |
Structural Signing |
COMPLETE |
|
| 602440 |
ROYALSTON- BRIDGE REPLACEMENT, BR# R-12-012 DELAND ROAD OVER PRIEST BROOK |
Bridge Replacement |
COMPLETE |
|
| 602467 |
WINCHENDON- TRAFFIC SAFETY IMPROVEMENTS AT INTERSECTION OF ROUTES 140 (GARDNER ROAD) AND ROUTE 12 (SPRING STREET) |
Traffic Signals |
COMPLETE |
|
| 602517 |
DISTRICT 2- IMPROVEMENT AND REFURBISHMENT OF HYDRO CELL CRASH CUSHIONS AT VARIOUS LOCATIONS |
Impact Attenuators |
COMPLETE |
|
| 602518 |
DISTRICT 2- IMPROVEMENT AND REFURBISHMENT OF SAND BARREL CRASH CUSHIONS AT VARIOUS LOCATIONS |
Impact Attenuators |
COMPLETE |
|
| 602538 |
NORTHAMPTON- BRIDGE REPLACEMENT, BR# N-19-023, BLISS STREET OVER THE MILL RIVER |
Bridge Replacement |
COMPLETE |
|
| 602541 |
ORANGE- CONSTRUCTION OF A CHEMICAL STORAGE SHED AND RELATED WORK AT THE MAINTENANCE DEPOT ON ROUTE 122 |
Chemical Storage Sheds |
COMPLETE |
|
| 602561 |
GREENFIELD- STREETSCAPE ENHANCEMENT ON MAIN STREET (ROUTE 2A) |
Hwy Reconstr - Restr and Rehab |
COMPLETE |
|
| 602574 |
PALMER- RECONSTRUCTION OF MAIN STREET FROM SYKES STREET TO HIGH STREET INTERSECTION |
Hwy. Reconstr - Minor Widening |
COMPLETE |
|
| 602601 |
AGAWAM- HIGHWAY RECONSTRUCTION, RIVER ROAD (FROM THE INTERSECTION OF SCHOOL STREET NORTHERLY TO THE END OF STATE HWY AT E. MEADOW STREET) |
Hwy. Reconstr - Minor Widening |
COMPLETE |
|
| 602647 |
NORTHAMPTON- TRAFFIC SIGNALS, INTERSECTION OF NORTH MAPLE STREET AND BRIDGE ROAD. FA# STP-001S(286)X |
Traffic Signals |
COMPLETE |
|
| 602662 |
BROOKFIELD- WEST BROOKFIELD- RESURFACING AND RELATED WORK ON ROUTE 9, WARE ROAD, MAIN STREET AND BROOKFIELD ROAD |
Resurfacing |
COMPLETE |
|
| 602663 |
HOLYOKE- TRAFFIC SIGNALS (WESTFIELD RD.) AT HOMESTEAD AVE. & CHERRY ST. AT HILLSIDE AVE AT ROUTE 202 |
Traffic Signals |
COMPLETE |
|
| 602679 |
TEMPLETON- CONSTRUCTION OF A SANITARY BUILDING AT THE TEMPLETON REST AREA ON ROUTE 2 WESTBOUND |
Vertical Construction (Ch 149) |
COMPLETE |
|
| 602695 |
DISTRICT 2- UPGRADES TO SANITARY FACILITIES AT VARIOUS MHD MAINTENANCE LOCATIONS (CONTRACT 1) |
Vertical Construction (Ch 149) |
COMPLETE |
|
| 602702 |
GREENFIELD- BRIDGE CONSTRUCTION, FRANKLIN COUNTY BIKEWAY OVER THE GREEN RIVER |
Bikeway/Bike Path Construction |
COMPLETE |
|
| 602714 |
PALMER- EMERGENCY CONSTRUCTION OF A RETAINING WALL, BR# P-01-027 MAIN STREET OVER CONRAIL |
Bridge Reconstruction/Rehab |
COMPLETE |
|
| 602768 |
DISTRICT 2- UPGRADES TO SANITARY FACILITIES AT VARIOUS MHD MAINTENANCE LOCATIONS (CONTRACT #2) |
Sewer and Water |
COMPLETE |
|
| 602778 |
DISTRICT 2- HIGHWAY GUARDRAIL UPGRADE AND REPLACEMENT AT VARIOUS LOCATIONS |
Guard Rail & Fencing |
COMPLETE |
|
| 602795 |
DEERFIELD- CULVERT INSTALLATION AND RELATED WORK ON SECTIONS OF ROUTE 5 AND 10 |
Hwy Reconstr - Restr and Rehab |
COMPLETE |
|
| 602812 |
DISTRICT 2- SCHEDULED AND EMERGENCY BRIDGE DECK REPAIRS AT VARIOUS LOCATIONS |
Structures Maintenance |
COMPLETE |
|
| 602816 |
DISTRICT 2- SOLID WASTE REMOVAL AT VARIOUS MHD FACILITIES |
Hazardous Waste Remediation |
COMPLETE |
|
| 602828 |
AMHERST- ROADWAY CONSTRUCTION ON SNELL ST. AND CONSTRUCTION OF MULTI-USE PATH ALONG UNIVERSITY DRIVE (UMASS CONNECTOR BIKEWAY) |
Bikeway/Bike Path Construction |
COMPLETE |
|
| 602829 |
HOLYOKE- BRIDGE BETTERMENT, H-21-024, LOWER WESTFIELD ROAD OVER PV RR |
Structures Maintenance |
COMPLETE |
|
| 602834 |
AGAWAM- SPRINGFIELD- BRIDGE REHABILITATION, A-05-001=S-24-005, ROUTE 5 OVER CONNECTICUT RIVER (JULIA B. BUXTON MEMORIAL BRIDGE) |
Bridge Reconstruction/Rehab |
COMPLETE |
|
| 602837 |
DISTRICT 2- DISTRICT 3- GUARDRAIL REFURBISHMENT AND DELINEATION PROJECT ON ROUTE 2 FROM LITTLETON TO PHILLIPSTON |
Guard Rail & Fencing |
COMPLETE |
|
| 602852 |
BELCHERTOWN- BRIDGE REPLACEMENT, BR# B-05-027, ROUTE 9 OVER SWIFT RIVER |
Bridge Replacement |
COMPLETE |
|
| 602853 |
WINCHENDON- BRIDGE REPLACEMENT, BR# W-39-018, ROUTE 202 (GLENALLEN STREET) OVER NORTH BRANCH OF MILLERS RIVER |
Bridge Replacement |
COMPLETE |
|
| 602855 |
SOUTHAMPTON- BRIDGE REPLACEMENT, BR# S-19-009 ROUTE 10 (COLLEGE HIGHWAY) OVER MANHAN RIVER |
Bridge Replacement |
COMPLETE |
|
| 602862 |
LUDLOW- SPRINGFIELD- STRUCTURE MAINTENANCE, BR# L-16-008=S-24-002 ROUTE 21 (CENTER STREET) OVER CHICOPEE RIVER (PUTTS BRIDGE) |
Structures Maintenance |
COMPLETE |
|
| 602871 |
DISTRICT 2- NON-ROUTINE AND EMERGENCY STRUCTURAL BRIDGE REPAIRS AT VARIOUS LOCATIONS |
Structures Maintenance |
COMPLETE |
|
| 602903 |
EASTHAMPTON- SITE CLEARING ON MANHAN RAIL TRAIL FROM COTTAGE STREET RUNNING N.EASTERLY ALONG ABANDONED RAIL LINE TO FERRY ST. |
Bikeway/Bike Path Construction |
COMPLETE |
|
| 602918 |
DISTRICT 2- APPLICATION OF REFLECTORIZED PAVEMENT MARKINGS ON VARIOUS STATE HIGHWAYS (5 SEPARATE CONTRACTS) |
Pavement Marking |
COMPLETE |
|
| 602943 |
ATHOL- PHILLIPSTON- SAFETY IMPROVEMENTS ALONG ROUTE 2 INCLUDING INSTALLATION OF MEDIAN BARRIER |
Safety Improvements |
COMPLETE |
|
| 602946 |
GARDNER- WINCHENDON- CONSTRUCTION OF A BICYCLE PATH, NORTH CENTRAL PATHWAY (PHASE III) |
Bikeway/Bike Path Construction |
COMPLETE |
|
| 602958 |
MONTAGUE- CONSTRUCTION OF THE FRANKLIN COUNTY BIKEWAY (PHASE I) |
Bikeway/Bike Path Construction |
COMPLETE |
|
| 602965 |
SPRINGFIELD- WEAVE ELIMINATION PROJECT ON ROUTE I-91 N.B. & S.B. BETWEEN EXIT 4 (MAIN STREET) & EXIT 6 (STATE STREET) |
Hwy Reconstr-No Added Capacity |
COMPLETE |
|
| 602998 |
BELCHERTOWN- PALMER- BRIDGE REPLACEMENT, BR# B-05-002=P-01-001 RIVER STREET OVER THE SWIFT RIVER (CANAL BRIDGE) |
Bridge Replacement |
COMPLETE |
|
| 603010 |
DISTRICT 2- CONSTRUCTION OF SOLID WASTE ACCUMULATION AREAS AT VARIOUS MHD MAINTENANCE FACILITIES |
New Construction |
COMPLETE |
|
| 603032 |
HATFIELD- NORTHAMPTON- WHATELY- RESURFACING AND RELATED WORK ON A SECTION OF ROUTE I-91 NB & SB |
Resurfacing |
COMPLETE |
|
| 603059 |
DISTRICT 1- DISTRICT 2- SCHEDULED AND EMERGENCY TRAFFIC OPERATIONS (4 SEPARATE CONTRACTS) |
Miscellaneous/No Prequal |
COMPLETE |
|
| 603074 |
EASTHAMPTON- CONSTRUCTION OF MANHAN TRAIL (PHASE II) ALONG ABANDONED MANHAN RAILROAD LINE FROM SOUTH STREET TO ROUTE 5 |
Bikeway/Bike Path Construction |
COMPLETE |
|
| 603083 |
CHICOPEE- GREENFIELD- SLOPE REPAIRS AND STABILIZATION ON ROUTE 33 AND INTERSTATE 91 |
Miscellaneous/No Prequal |
COMPLETE |
|
| 603126 |
DISTRICT 2- SCHEDULED AND EMERGENCY INSTALLATION OF BRIDGE SHIELDING SYSTEMS AT VARIOUS LOCATIONS (5 SEPARATE CONTRACTS) |
Structures Maintenance |
COMPLETE |
|
| 603159 |
DEERFIELD- EASTHAMPTON- SOUTHAMPTON- RESURFACING AND RELATED WORK ON SECTIONS OF ROUTE 10 AND 116 |
Resurfacing |
COMPLETE |
|
| 603168 |
DISTRICT 2- ASBESTOS ABATEMENT AND DISPOSAL AT THE DISTRICT MAINTENANCE FACILITIES DISTRICT WIDE (3 SEPARATE CONTRACTS) |
Asbestos Removal |
COMPLETE |
|
| 603174 |
AGAWAM- CONSTRUCTION OF A WALKWAY/BIKEWAY ALONG THE CONNECTICUT RIVER |
Bikeway/Bike Path Construction |
COMPLETE |
|
| 603175 |
DISTRICT 2- FENCE UPGRADE AND REPLACEMENT AT VARIOUS LOCATIONS |
Guard Rail & Fencing |
COMPLETE |
|
| 603181 |
DISTRICT 2- CRASH CUSHION REPAIR (SAND BARREL & HYDRO CELL) AT VARIOUS LOCATIONS |
Impact Attenuators |
COMPLETE |
|
| 603184 |
CHICOPEE- EMERGENCY BRIDGE REPAIRS, BR# C-13-011 ROUTE 141 (MONTGOMERY STREET) OVER THE CHICOPEE RIVER (DEADY MEMORIAL BRIDGE) |
Structures Maintenance |
COMPLETE |
|
| 603185 |
DISTRICT 2- HIGHWAY LIGHTING UPGRADES AT VARIOUS LOCATIONS (3 SEPARATE CONTRACTS) |
Lighting and Electrical |
COMPLETE |
|
| 603186 |
DISTRICT 2- RECONSTRUCTION OF DRAINAGE STRUCTURES AT VARIOUS LOCATIONS ALONG STATE HIGHWAYS |
Miscellaneous/No Prequal |
COMPLETE |
|
| 603187 |
DEERFIELD- GREENFIELD- WHATELY- RESURFACING AND RELATED WORK ON A SECTION OF ROUTE I-91 |
Resurfacing |
COMPLETE |
|
| 603236 |
SOUTHWICK- INSTALLATION OF TRAFFIC CONTROL SYSTEM, ROUTE 57 (FEEDING HILLS ROAD) AT FOSTER ROAD AND NORTH LANGYARD ROAD |
Safety Improvements |
COMPLETE |
|
| 603260 |
SOUTH HADLEY- BRIDGE REPLACEMENT, S-18-007, ROUTE 47 (HADLEY STREET) OVER BACHELOR BROOK |
Bridge Replacement |
COMPLETE |
|
| 603265 |
ATHOL- ERVING- GILL- GREENFIELD- ORANGE- PHILLIPSTON- WENDELL- SAFETY IMPROVEMENTS ALONG ROUTE 2 |
Safety Improvements |
COMPLETE |
|
| 603266 |
ERVING- NORTHFIELD- RESURFACING AND RELATED WORK ON A SECTION OF ROUTE 63 |
Resurfacing |
COMPLETE |
|
| 603274 |
BELCHERTOWN- BRIDGE BETTERMENT, BR# B-05-007, MILL VALLEY ROAD (ROUTE 181) OVER JABISH BROOK |
Structures Maintenance |
COMPLETE |
|
| 603337 |
GREENFIELD- FRANKLIN COUNTY BIKEWAY (PHASE III) RIVERSIDE DRIVE TO NASH MILL ROAD |
Bikeway/Bike Path Construction |
COMPLETE |
|
| 603346 |
DISTRICT 2- FABRICATION AND INSTALLATION OF GROUND MOUNTED TOURIST INFORMATION SIGNS ON VARIOUS STATE HIGHWAYS (4 SEP. CONTRACTS.) |
Sign Installation/Upgrading |
COMPLETE |
|
| 603354 |
DISTRICT 2- NON-ROUTINE AND EMERGENCY STRUCTURAL MAINTENANCE AT VARIOUS LOCATIONS |
Structures Maintenance |
COMPLETE |
|
| 603363 |
DISTRICT 2- SCHEDULED AND EMERGENCY BRIDGE DECK REPAIRS AT VARIOUS LOCATIONS |
Structures Maintenance |
COMPLETE |
|
| 603374 |
DISTRICT 2- SCHEDULED AND EMERGENCY REPAIRS TO BRIDGE SUBSTRUCTURES AND PARAPETS |
Structures Maintenance |
COMPLETE |
|
| 603375 |
BELCHERTOWN- BRIDGE REPLACEMENT, B-05-005, RIVER STREET OVER JABISH BROOK |
Bridge Replacement |
COMPLETE |
|
| 603390 |
BERNARDSTON- SCOUR REPAIRS AND EMBANKMENT MODIFICATION, B-10-001, ROUTE 10 (NORTHFIELD ROAD) OVER THE FALLS RIVER |
Structures Maintenance |
COMPLETE |
|
| 603407 |
DISTRICT 2- RESURFACING AND RELATED WORK AT VARIOUS LOCATIONS |
Resurfacing |
COMPLETE |
|
| 603423 |
ATHOL- CONSTRUCTION OF A CHEMICAL STORAGE BUILDING AND RELATED WORK AT THE MAINTENANCE DEPOT ON ROUTE 32 |
Chemical Storage Sheds |
COMPLETE |
|
| 603433 |
DISTRICT 2- EMERGENCY REPAIRS TO TRAFFIC SIGNALS AT VARIOUS LOCATIONS |
Traffic Signals |
COMPLETE |
|
| 603435 |
HOLLAND- STURBRIDGE- TRAFFIC GUIDE SIGN UPGRADES ON ROUTE I-84 FROM CONNECTICUT S.L. TO MASS TURNPIKE |
Sign Installation/Upgrading |
COMPLETE |
|
| 603466 |
DISTRICT 2- RESURFACING AT VARIOUS LOCATIONS |
Resurfacing |
COMPLETE |
|
| 603526 |
DISTRICT 2- REPLACEMENT AND REFURBISHMENT OF CRASH CUSHIONS AT VARIOUS LOCATIONS (HYDROCELL, G.R.E.A.T., HEX-FOAM & SAND BARREL) |
Impact Attenuators |
COMPLETE |
|
| 603527 |
DISTRICT 2- CLEANING AND FILLING OF PAVEMENT CRACKS AT VARIOUS LOCATIONS |
Crack Sealing |
COMPLETE |
|
| 603528 |
DISTRICT 2- DRAINAGE BETTERMENT AND CULVERT REPAIRS AT VARIOUS LOCATIONS DISTRICT WIDE |
Catch Basin Cleaning |
COMPLETE |
|
| 603529 |
DISTRICT 2- SCHEDULED AND EMERGENCY BRIDGE DECK JOINT REPAIRS AT VARIOUS LOCATIONS |
Structures Maintenance |
COMPLETE |
|
| 603530 |
DISTRICT 2- RECONSTRUCTION OF DRAINAGE STRUCTURES AT VARIOUS LOCATIONS |
Structures Maintenance |
COMPLETE |
|
| 603555 |
DISTRICT 2- APPLICATION OF REFLECTORIZED THERMOPLASTIC PAVEMENT MARKINGS ON VARIOUS STATE HIGHWAYS (5 SEPARATE CONTRACTS) |
Pavement Marking |
COMPLETE |
|
| 603566 |
BARRE- BRIDGE REPLACEMENT, B-02-012, VERNON AVENUE OVER THE WARE RIVER |
Bridge Replacement |
COMPLETE |
|
| 603575 |
WARE- BRIDGE REPLACEMENT, BR# W-05-011, HARDWICK POND ROAD OVER MUDDY BROOK |
Bridge Replacement |
COMPLETE |
|
| 603579 |
CHICOPEE- TEMPORARY BRIDGE DECK, BR# C-13-011 ROUTE 141 (MONTGOMERY ST.) OVER THE CHICOPEE RIVER (DEADY MEMORIAL BRIDGE) PHASE I |
Bridge Reconstruction/Rehab |
COMPLETE |
|
| 603585 |
AMHERST- BRIDGE REPLACEMENT, BR# A-08-013, MEADOW STREET OVER SWAMP BROOK (EASTMAN BROOK) |
Bridge Replacement |
COMPLETE |
|
| 603589 |
HOLYOKE- BRIDGE PAINTING, BR# H-21-055, ROUTE I-91 (S.B.RAMP) OVER ROUTE 141 (E.B.) |
Painting - Structural |
COMPLETE |
|
| 603592 |
DISTRICT 2- REPAIRS TO MAINTENANCE FACILITIES DISTRICT WIDE |
Vertical Construction (Ch 149) |
COMPLETE |
|
| 603598 |
SPRINGFIELD- TRAFFIC SAFETY IMPROVEMENTS ON INTERSTATE 91 AT EXIT 10 (NB RAMP OF INTERSTATE 91 AT DOVER AND MAIN STREETS) |
Traffic Signals |
COMPLETE |
|
| 603600 |
DISTRICT 2- HEADWALL AND DRAINAGE DITCH REPAIR AT VARIOUS LOCATIONS |
Sewer and Water |
COMPLETE |
|
| 603611 |
DISTRICT 2- FABRICATION AND INSTALLATION OF OVERHEAD AND GROUND MOUNTED GUIDE SIGNS (5 SEPARATE CONTRACTS) |
Sign Installation/Upgrading |
COMPLETE |
|
| 603625 |
DISTRICT 2- TREE REMOVAL AND SIGHT DISTANCE CLEARING AT VARIOUS LOCATIONS |
Landscape and Roadside Develop |
COMPLETE |
|
| 603631 |
DISTRICT 2- SOLID WASTE REMOVAL AT VARIOUS MHD FACILITIES (5 SEPARATE CONTRACTS) |
Process/Recycle/Trnsprt Soils |
COMPLETE |
|
| 603702 |
DISTRICT 2- FENCE REPAIRS AND UPGRADES AT VARIOUS LOCATIONS |
Guard Rail & Fencing |
COMPLETE |
|
| 603707 |
AMHERST- HADLEY- SUNDERLAND- RESURFACING AND RELATED WORK ON A SECTION OF ROUTE 116 |
Resurfacing |
COMPLETE |
|
| 603736 |
DISTRICT 2- SCHEDULED AND EMERGENCY BRIDGE DECK REPAIRS AT VARIOUS LOCATIONS |
Structures Maintenance |
COMPLETE |
|
| 603737 |
DISTRICT 2- HIGHWAY LIGHTING MAINTENANCE AND UPGRADES AT VARIOUS LOCATIONS |
Lighting and Electrical |
COMPLETE |
|
| 603741 |
DISTRICT 2- RECONSTRUCTION OF DRAINAGE STRUCTURES AT VARIOUS LOCATIONS IN SECTION 2A |
Structures Maintenance |
COMPLETE |
|
| 603743 |
DISTRICT 2- GUARDRAIL REFURBISHMENT AT VARIOUS LOCATIONS |
Guard Rail & Fencing |
COMPLETE |
|
| 603744 |
DISTRICT 2- RECONSTRUCTION OF DRAINAGE STRUCTURES AT VARIOUS LOCATIONS IN SECTION 2B |
Structures Maintenance |
COMPLETE |
|
| 603746 |
DISTRICT 2- CATCH BASIN CLEANING AT VARIOUS LOCATIONS |
Catch Basin Cleaning |
COMPLETE |
|
| 603775 |
HOLYOKE- SPRINGFIELD- WEST SPRINGFIELD- HIGHWAY THRIE BEAM GUARDRAIL UPGRADES ALONG I-91 MEDIAN |
Guard Rail & Fencing |
COMPLETE |
|
| 603786 |
HADLEY- RESURFACING AND RELATED WORK ON A SECTION OF ROUTE 116 |
Resurfacing |
COMPLETE |
|
| 603797 |
GRANBY- BRIDGE REPLACEMENT, BR# G-09-004, ALDRICH STREET OVER BACHELOR BROOK |
Bridge Replacement |
COMPLETE |
|
| 603801 |
DISTRICT 2- HERBICIDE APPLICATION TO VARIOUS STATE RIGHT OF WAYS TO CONTROL NUISANCE VEGETATION |
Landscape and Roadside Develop |
COMPLETE |
|
| 603821 |
LUDLOW- INTERSECTION IMPROVEMENTS, ROUTE 21 (CENTER STREET) AT CHAPIN STREET AND AT MASS PIKE EXIT 7 AND HARDING ST. |
Traffic Signals |
COMPLETE |
|
| 603841 |
DISTRICT 2- REPAIRS TO ASPHALT AT VARIOUS LOCATIONS |
Hwy Reconstr - Restr and Rehab |
COMPLETE |
|
| 603844 |
AGAWAM- BRIDGE BETTERMENTS, BR# A-05-013 ROUTE 5/ROUTE 57(WEST TRAFFIC CIRCLE) & A-05-014 ROUTE 5/ROUTE 57(EAST TRAFFIC CIRCLE) |
Structures Maintenance |
COMPLETE |
|
| 603872 |
MONTAGUE- RESURFACING AND RELATED WORK, MILLERS FALL ROUTE 63 |
Resurfacing |
COMPLETE |
|
| 603879 |
WEST SPRINGFIELD- ROUTE 20 PLANING AND RESURFACING |
Resurfacing |
COMPLETE |
|
| 603880 |
DISTRICT 2- SCHEDULED AND EMERGENCY BRIDGE DECK JOINT REPAIRS AT VARIOUS LOCATIONS |
Structures Maintenance |
COMPLETE |
|
| 603881 |
MONTAGUE- MILLERS FALLS STREETSCAPES I AND II, RTE 63- (FEDERAL ST., BRIDGE RD.) EAST AND WEST MAIN ST. |
Landscape and Roadside Develop |
COMPLETE |
|
| 603899 |
DISTRICT 2- INSTALLATION OF SIGNS ON VARIOUS STATE HIGHWAYS (4 SEPARATE CONTRACTS) |
Sign Installation/Upgrading |
COMPLETE |
|
| 603926 |
WESTFIELD- WEST SPRINGFIELD- ROUTE 20 COLD PLANING AND RESURFACING |
Resurfacing |
COMPLETE |
|
| 603932 |
WINCHENDON- RESURFACING AND RELATED WORK ON A SECTION OF ROUTE 140 (GARDNER ROAD) |
Resurfacing |
COMPLETE |
|
| 603936 |
LUDLOW- WILBRAHAM- BRIDGE RECONSTRUCTION, L-16-003=W-35-001, MILLER STREET & COTTAGE AVENUE OVER CHICOPEE RIVER |
Bridge Reconstruction/Rehab |
COMPLETE |
|
| 603950 |
DISTRICT 2- INSTALLATION OF POST-INTERCHANGE DISTANCE SIGNING (4 CONTRACTS) |
Structural Signing |
COMPLETE |
|
| 603960 |
MONSON- BRIDGE REHABILITATION, M-27-010, HOSPITAL ROAD OVER CHICOPEE BROOK |
Bridge Reconstruction/Rehab |
COMPLETE |
|
| 603962 |
DISTRICT 2- APPLICATION OF REFLECTORIZED PAVEMENT MARKINGS (THERMOPLASTIC) AT VARIOUS LOCATIONS |
Pavement Marking |
COMPLETE |
|
| 603991 |
DISTRICT 2- REPAIRS TO IMPACT ATTENUATORS AT VARIOUS LOCATIONS |
Impact Attenuators |
COMPLETE |
|
| 603995 |
DISTRICT 2- TREE REMOVAL AND SIGHT DISTANCE CLEARING |
Landscape and Roadside Develop |
COMPLETE |
|
| 604054 |
DISTRICT 2- RUMBLE STRIP APPLICATION ALONG ROADWAY EDGE LINES (4 CONTRACTS) |
Contract Highway Maintenance |
COMPLETE |
|
| 604058 |
DISTRICT 2- DRAINAGE BETTERMENT AND CULVERT REPAIR AT VARIOUS LOCATIONS |
Catch Basin Cleaning |
COMPLETE |
|
| 604059 |
DISTRICT 2- TRAFFIC SIGNAL BETTERMENT |
Traffic Signals |
COMPLETE |
|
| 604060 |
DISTRICT 2- EMERGENCY STRUCTURAL BRIDGE REPAIRS |
Structures Maintenance |
COMPLETE |
|
| 604074 |
DISTRICT 2- CLEANING AND FILLING OF PAVEMENT CRACKS AT VARIOUS LOCATIONS |
Crack Sealing |
COMPLETE |
|
| 604075 |
DISTRICT 2- RECONSTRUCTION OF DRAINAGE STRUCTURES (SECTION 2A) |
Catch Basin Cleaning |
COMPLETE |
|
| 604077 |
DISTRICT 2- RECONSTRUCTION OF DRAINAGE STRUCTURES (SECTION 2B) |
Catch Basin Cleaning |
COMPLETE |
|
| 604124 |
DISTRICT 2- BRIDGE SUBSTRUCTURE REPAIRS |
Structures Maintenance |
COMPLETE |
|
| 604125 |
DISTRICT 2- SCHEDULED AND EMERGENCY BRIDGE DECK REPAIRS |
Structures Maintenance |
COMPLETE |
|
| 604126 |
DISTRICT 2- HIGHWAY LIGHTING UPGRADE |
Lighting and Electrical |
COMPLETE |
|
| 604127 |
BERNARDSTON- GREENFIELD- MICROSURFACING PAVEMENT PRESERVATION AND RELATED REPAIRS, ROUTE I-91 |
Resurfacing |
COMPLETE |
|
| 604128 |
DEERFIELD- MONTAGUE- BIKE TRAIL CONSTRUCTION, FRANKLIN COUNTY BIKEWAY (PHASE I, Part A) |
Bikeway/Bike Path Construction |
COMPLETE |
|
| 604144 |
DISTRICT 2- GUARDRAIL END UPGRADES AT VARIOUS LOCATIONS |
Guard Rail & Fencing |
COMPLETE |
|
| 604183 |
ATHOL- ERVING- GILL- GREENFIELD- ORANGE- PHILLIPSTON- WENDELL- SAFETY IMPROVEMENTS, ROUTE 2 |
Safety Improvements |
COMPLETE |
|
| 604192 |
DISTRICT 2- TREE REMOVAL AND SIGHT DISTANCE CLEARING AT VARIOUS LOCATIONS |
Landscape and Roadside Develop |
COMPLETE |
|
| 604194 |
DISTRICT 2- RECONSTRUCTION OF DRAINAGE STRUCTURES (SECTION 2A) |
Structures Maintenance |
COMPLETE |
|
| 604195 |
DISTRICT 2- DRAINAGE BETTERMENT AND CULVERT REPAIR AT VARIOUS LOCATIONS |
Contract Highway Maintenance |
COMPLETE |
|
| 604204 |
AGAWAM- RESIDENT WATER SUPPLY AND WELL CLOSURE, ROUTE 57 |
Sewer and Water |
COMPLETE |
|
| 604205 |
WILBRAHAM- SIGNALIZATON & IMPROVEMENTS, BOSTON ROAD (STATE ROUTE 20) AT POST OFFICE BUSINESS PARK |
Traffic Signals |
COMPLETE |
|
| 604208 |
HATFIELD- RECLAMATION & RELATED WORK ON ELM STREET |
Hwy Reconstr-No Added Capacity |
COMPLETE |
|
| 604226 |
DISTRICT 2- SCHEDULED AND EMERGENCY TRAFFIC OPERATIONS |
Miscellaneous/No Prequal |
COMPLETE |
|
| 604247 |
DISTRICT 2- FABRICATION AND INSTALLATION OF SIGNS AND SUPPORTS |
Structural Signing |
COMPLETE |
|
| 604281 |
HOLYOKE- NORTHAMPTON- BRIDGE DECK REPAIRS, I-91, H-21-041, N-19-061, N-19-062, N-19-064 |
Structures Maintenance |
COMPLETE |
|
| 604316 |
DISTRICT 2- FENCE REPAIRS AND UPGRADE AT VARIOUS LOCATIONS |
Guard Rail & Fencing |
COMPLETE |
|
| 604317 |
DISTRICT 2- HIGHWAY GUARDRAIL UPGRADE AND REPLACEMENT |
Guard Rail & Fencing |
COMPLETE |
|
| 604325 |
CHICOPEE- WEST SPRINGFIELD- BRIDGE DECK REPAIR, C-13-034 = W-21-043, I-91 CONNECTICUT RIVER, B&M RAILROAD AND ST. 116 |
Structures Maintenance |
COMPLETE |
|
| 604356 |
DISTRICT 2- WINDOW AND DOOR REPLACEMENT AND OTHER MISCELLANEOUS WORK AT ADMINISTRATION BUILDING |
Miscellaneous/No Prequal |
COMPLETE |
|
| 604358 |
DISTRICT 2- APPLICATION OF REFLECTORIZED PAVEMENT MARKINGS (THERMOPLASTIC) VARIOUS STATE HIGHWAYS |
Pavement Marking |
COMPLETE |
|
| 604371 |
DISTRICT 2- RESURFACING AND RELATED WORK AT VARIOUS LOCATIONS |
Resurfacing |
COMPLETE |
|
| 604372 |
DISTRICT 2- MAINTENANCE OF VARIOUS FACILITIES (CARPENTRY, MASONRY & WELDING) |
Structures Maintenance |
COMPLETE |
|
| 604376 |
HARDWICK- NEW BRAINTREE- RESURFACING & RELATED WORK ON ROUTE 32 (MAIN STREET) |
Resurfacing |
COMPLETE |
|
| 604396 |
DISTRICT 2- HERBICIDE APPLICATION AT VARIOUS LOCATIONS |
Mowing and Spraying |
COMPLETE |
|
| 604402 |
DISTRICT 2- RECONSTRUCTION OF DRAINAGE STRUCTURES (SECTION 2B) |
Structures Maintenance |
COMPLETE |
|
| 604411 |
DISTRICT 2- NON-ROUTINE AND EMERGENCY PRESERVATION BRIDGE REPAIRS |
Structures Maintenance |
COMPLETE |
|
| 604438 |
ORANGE- RESURFACING AND RELATED WORK, ROUTE 202, ROUTE M137 (DANIEL SHAYS HIGHWAY) AND ROUTE 122 |
Resurfacing |
COMPLETE |
|
| 604451 |
NORTHAMPTON- SIGNAL & INTERSECTION IMPROVEMENTS ON EARLE STREET |
Traffic Signals |
COMPLETE |
|
| 604497 |
DISTRICT 2- CATCH BASIN CLEANING AT VARIOUS LOCATIONS |
Catch Basin Cleaning |
COMPLETE |
|
| 604503 |
WEST SPRINGFIELD- BRIDGE DECK REPAIRS AND RESURFACING, BR# W-21-036, BRUSH HILL AVENUE, I-91 |
Structures Maintenance |
COMPLETE |
|
| 604504 |
AGAWAM- BRIDGE DECK REPAIRS AND RESURFACING, BR# A-05-021, (EASTBOUND AND SOUTHBOUND) ST 57 AND ST 75 |
Structures Maintenance |
COMPLETE |
|
| 604508 |
AGAWAM- RESURFACING AND RELATED WORK, ROUTE 57 |
Resurfacing |
COMPLETE |
|
| 604509 |
TEMPLETON- PHILLIPSTON- RESURFACING AND RELATED WORK, ROUTE 2 |
Resurfacing |
COMPLETE |
|
| 604513 |
WESTFIELD- RESURFACING AND RELATED WORK, ROUTE 20 |
Resurfacing |
COMPLETE |
|
| 604520 |
GRANBY- SOUTH HADLEY- RESURFACING AND RELATED WORK, ROUTE 202 (GRANBY ROAD AND WEST STATE STREET) |
Resurfacing |
COMPLETE |
|
| 604523 |
SOUTHAMPTON- RESURFACING AND RELATED WORK, ROUTE 10 |
Resurfacing |
COMPLETE |
|
| 604616 |
DISTRICT 2- TREE TRIMMING & SIGHT DISTANCE IMPROVEMENT |
Contract Highway Maintenance |
COMPLETE |
|
| 604617 |
DISTRICT 2- DRAINAGE BETTERMENT AND CULVERT REPAIR |
Catch Basin Cleaning |
COMPLETE |
|
| 604618 |
DISTRICT 2- FENCE REPAIRS AND UPGRADES AT VARIOUS LOCATIONS |
Guard Rail & Fencing |
COMPLETE |
|
| 604623 |
DISTRICT 2- CLEANING AND FILLING OF PAVEMENT CRACKS |
Crack Sealing |
COMPLETE |
|
| 604624 |
DISTRICT 2- REPAIRS TO IMPACT ATTENUATORS (CRASH CUSHION) AT VARIOUS LOCATIONS |
Impact Attenuators |
COMPLETE |
|
| 604639 |
LONGMEADOW- SPRINGFIELD- INTERSTATE RESURFACING, ROUTE I-91 |
Resurfacing |
COMPLETE |
|
| 604643 |
GREENFIELD- ROTARY IMPROVEMENTS (ROUTES 2 AND 2A) AT I-91 |
Hwy. Reconstr - Minor Widening |
COMPLETE |
|
| 604654 |
DISTRICT 2- APPLICATION OF REFLECTORIZED (THERMOPLASTIC) PAVEMENT MARKINGS AT VARIOUS LOCATIONS |
Impact Attenuators |
COMPLETE |
|
| 604657 |
HARDWICK- BRIDGE BETTERMENT, BR# H-08-004, ROUTE 32 (MAIN STREET) OVER THE WARE RIVER |
Structures Maintenance |
COMPLETE |
|
| 604673 |
PALMER- CHEMICAL STORAGE SHED CONSTRUCTION |
Vertical Construction (Ch 149) |
COMPLETE |
|
| 604702 |
DISTRICT 2- SCHEDULED & EMERGENCY BRIDGE DECK JOINT REPAIRS |
Structures Maintenance |
COMPLETE |
|
| 604705 |
DISTRICT 2- SCHEDULED AND EMERGENCY BRIDGE DECK REPAIRS |
Structures Maintenance |
COMPLETE |
|
| 604711 |
DISTRICT 2- RESURFACING & RELATED WORK AT VARIOUS LOCATIONS |
Resurfacing |
COMPLETE |
|
| 604866 |
DISTRICT 2- SCHEDULED & EMERGENCY TRAFFIC MANAGEMENT AT VARIOUS LOCATIONS |
Miscellaneous/No Prequal |
COMPLETE |
|
| 604873 |
DISTRICT 2- NON-ROUTINE & EMERGENCY BRIDGE REPAIRS AT VARIOUS LOCATIONS |
Structures Maintenance |
COMPLETE |
|
| 604924 |
DISTRICT 2- RECONSTRUCTION OF DRAINAGE STRUCTURES AT VARIOUS LOCATIONS (SECTION 2B) |
Catch Basin Cleaning |
COMPLETE |
|
| 604925 |
DISTRICT 2- RECONSTRUCTION OF DRAINAGE STRUCTURES AT VARIOUS LOCATIONS (SECTION 2A) |
Catch Basin Cleaning |
COMPLETE |
|
| 604927 |
DISTRICT 2- FACILITY MAINTENANCE AND REPAIRS |
Vertical Construction (Ch 149) |
COMPLETE |
|
| 604941 |
AGAWAM- MHD BUILDING DEMOLITION AT 157 SOUTHWEST STREET |
Demolition |
COMPLETE |
|
| 604946 |
DISTRICT 2- BRIDGE SUBSTRUCTURE REPAIRS AT VARIOUS LOCATIONS |
Structures Maintenance |
COMPLETE |
|
| 604963 |
DISTRICT 2- HERBICIDE APPLICATION AT VARIOUS LOCATIONS |
Mowing and Spraying |
COMPLETE |
|
| 604965 |
DISTRICT 2- INSTALLATION OF BRIDGE SHIELDING AT VARIOUS LOCATIONS |
Structures Maintenance |
COMPLETE |
|
| 604992 |
BRIMFIELD- RESURFACING & RELATED WORK ON ROUTE 20 |
Resurfacing |
COMPLETE |
|
| 605118 |
DISTRICT 2- GUARDRAIL UPGRADES AT VARIOUS LOCATIONS |
Guard Rail & Fencing |
COMPLETE |
|
| 605125 |
DISTRICT 2- EMERGENCY TRAFFIC SIGNAL REPAIRS AT VARIOUS LOCATIONS |
Traffic Signals |
COMPLETE |
|
| 605134 |
WESTFIELD- RESURFACING & RELATED WORK ON ROUTE 10/202 |
Resurfacing |
COMPLETE |
|
| 605135 |
DISTRICT 2- SCHEDULED & EMERGENCY BRIDGE DECK REPAIRS |
Structures Maintenance |
COMPLETE |
|
| 605169 |
DISTRICT 2- HIGHWAY CLEANING ON I-91 AT VARIOUS LOCATIONS |
Highway Sweeping |
COMPLETE |
|
| 605246 |
DISTRICT 2- CATCH BASIN CLEANING AT VARIOUS LOCATIONS |
Catch Basin Cleaning |
COMPLETE |
|
| 605663 |
DISTRICT 2- PAVEMENT RECONSTRUCTION & RELATED WORK (BERNARDSTON DEPOT) |
Resurfacing |
COMPLETE |
|