| Project Description: |
SOMERVILLE- BRIDGE REPLACEMENT, S-17-016, WEBSTER AVENUE OVER THE MBTA & B&M RAILROAD
This project consists of replacing the Webster Avenue Bridge over the MBTA and Boston & Maine Rail Roads in Somerville. The existing bridge shall be replaced in its present location. Also included in the project is a utility bridge, permanent sheeting adjacent to the railroad tracks, retaining wall repair, and a detour to traffic during the construction of the bridge.
|
| Location: |
|
| Design Responsibility: | Consultant |
| Right of Way Responsibility: | MassHighway |
| Construction Begins: | Winter 2013/2014 |
| Project Manager: | Marie Rose![]() |
| Estimated Construction Cost: | $0.00 |
| MassHighway District: | District 4 |
| Current Status: | Comments on the 75% design phase project plans have been returned to the Design Engineer (as of 07/15/1999) |
|