SOMERVILLE- BRIDGE REPLACEMENT, S-17-016, WEBSTER AVENUE OVER THE MBTA & B&M RAILROAD
This project consists of replacing the Webster Avenue Bridge over the MBTA and Boston & Maine Rail Roads in Somerville. The existing bridge shall be replaced in its present location. Also included in the project is a utility bridge, permanent sheeting adjacent to the railroad tracks, retaining wall repair, and a detour to traffic during the construction of the bridge.
Location:
  • City of Somerville
  • Design Responsibility: Consultant
    Right of Way Responsibility: MassHighway
    Construction Begins: Winter 2013/2014
    Project Manager: Marie Rose
    Estimated Construction Cost: $0.00
    MassHighway District: District 4
    Current Status: Comments on the 75% design phase project plans have been returned to the Design Engineer (as of 07/15/1999)

    Contracts (0) Progress
    No contracts associated with this project

    Bridges

    See the Milestone Details tab for additional Project information
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Accelerated Bridge Program
    no comments
    No TIP Data Available For This Project
    Project Task Information
    Project Status
    Project Initiation Form PRC Submitted 06/24/2009
    Project Review Committee PRC Approved 08/13/2009
    Project Status Initiated 11/17/2005
    Prj Scope & Negotiation
    Design
    75% Design 75% Comments to DE 07/15/1999
    Right of Way
    Requirements Requirements 06/15/2009
    Traffic
    Design Exceptions
    Environmental
    ITS
    Utilities
    Non Participating