| Project Description: |
BOSTON- DEDHAM- BRIDGE REPLACEMENT, BR# B-16-177=D-05-006 ROUTE 109 (BRIDGE STREET/SPRING STREET) OVER THE CHARLES RIVER
The proposed project consists of rehabilitating the existing Route 109 bridge, over the Charles River, in its present location with minor improvements to the approach roadways. The bridge will remain open to traffic during construction.
|
| Location: |
|
| Construction Begins: | Summer 2001 |
| Construction Ends: | Spring 2005 |
| Resident Engineer: | Ed Moschella![]() |
| Construction Contract Value: | $5,000,038.32 |
| Construction Bid Price: | $2,821,479.50 |
| Initial Construction Estimate: | $1,392,231.50 |
| MassHighway District: | District 4 |
| Current Status: | This project has been completed. (as of 07/21/2005) |
|
Bridges
|
||||||||||||||
|
||||||||||
|
|
|
|||||||||||||||||||||||||||||||||||||||||||||||