Project Description:
CANTON- BRIDGE REPLACEMENT, BR# C-02-008 RELOCATED HIGH STREET OVER MBTA AND AMTRAK
The work consists of partial demolition of the existing bridge substructure, demolition of the existing bridge superstructure and construction of a 3 span multiple steel stringer bridge.
Location:
  • Town of Canton
  • Construction Begins: Spring 2003
    Construction Ends: Autumn 2006
    Resident Engineer: Brian Zilinsky
    Construction Contract Value: $2,333,561.12
    Construction Bid Price: $1,977,482.00
    Initial Construction Estimate: $2,593,400.00
    MassHighway District: District 4
    Current Status: All work complete with the exception of the extra work to furnish and install a holding - dissipation ponding area to eliminate drainage problems-70%complete. (as of 10/10/2006)
    Additional Info: A 45 day extension of time may be needed to process all materials documentaion and project information. (as of 10/10/2006)

    Contracts (2) Progress
    # 33272 -- Construction Contract
    Bridge Replacement C-2-8 (Steel) - High Street over MBTA / Amtrak. 100% Complete
    # 98125 -- Design -- Hwy Eng Open End
    Statewide - Assisting Highway Engineering Open - End Final

    Bridges

    Contract Dates
    Notice to Proceed: 05/08/2003
    Contract Information
    Project Designer: In-House Boston
    Funding Source: Non Federal Aid
    See the Milestone Details tab for additional Project information
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Construction
    Current Status
    All work complete with the exception of the extra work to furnish and install a holding - dissipation ponding area to eliminate drainage problems-70%complete.
    Additional Info
    A 45 day extension of time may be needed to process all materials documentaion and project information.
    Accelerated Bridge Program
    no comments
    No TIP Data Available For This Project
    Project Task Information
    Project Status
    Project Status Advertised 12/25/1993
    Project Status Advertised 01/25/2003
    Prj Scope & Negotiation
    Design
    Right of Way
    Traffic
    Design Exceptions
    Environmental
    ITS
    Utilities
    Non Participating