| Project Description: |
WATERTOWN- BRIDGE DEMOLITION, W-10-005, ROUTE 20 (MAIN STREET) OVER THE ABANDONED B & M RAILROAD
|
| Location: |
|
| Design Responsibility: | In-House Boston |
| Right of Way Responsibility: | Other |
| Construction Begins: | Spring 2012 |
| Project Manager: | Mark Carmichael![]() |
| Estimated Construction Cost: | $0.00 |
| MassHighway District: | District 4 |
| Current Status: | This project is in the preliminary design phase. |
|