| Project Description: |
NEWTON- ROADWAY WIDENING, DRAINAGE & SIGNAL UPGRADE, WALNUT STREET, AND CENTER ST. TO RTE. 9
This project includes upgrading the traffic signals at the intersection of Walnut Street and Center Street; reconstructing Walnut Street from Center Street to Route 9; and reconstructing Center Street from Walnut Street to Route 9.
|
| Location: |
|
| Design Responsibility: | Municipality |
| Right of Way Responsibility: | Other |
| Construction Begins: | Winter 2011/2012 |
| Project Manager: | David Shedd![]() |
| Estimated Construction Cost: | $3,000,000.00 |
| MassHighway District: | District 4 |
| Current Status: | The 25% project plan submission has been returned to the Design Engineer for revisions and resubmission. (as of 06/15/1998) |
|