| Project Description: |
BRAINTREE- DE-ICING STORAGE BUILDING & RELATED WORK
CONSTRUCTION OF A CHEMICAL ( SALT ) STORAGE BUILDING AND RELATED WORK.
|
| Location: |
|
| Design Responsibility: | In-House Boston |
| Right of Way Responsibility: | MassHighway |
| Construction Begins: | Winter 2010/2011 |
| Project Manager: | Thomas P Conneely![]() |
| Estimated Construction Cost: | $500,000.00 |
| MassHighway District: | District 4 |
| Current Status: | This project is in the preliminary design phase. |
|
Bridges |
||||||
|
|
|
||||||||||||||||||||||||||||||||||||||||||||