QUINCY- CENTER CONCOURSE IMPROVEMENTS ON REVERE ROAD (MCGRATH HIGHWAY - PHASE II)
This 1900-foot project includes roadway and sidewalk reconstruction and new traffic signals along the new alignment from the end of the Highway Division's Phase I project to the project limit west of the Washington Street intersection. A 600 ft section of Quincy Avenue/Hancock Street is proposed for reconstruction including the intersection with Elm Street/School Street. The project continues along Elm Street improving the roadway layout and corner geometries. Construction advances onto Mechanic Street for 500 feet concluding at the intersection with Revere Road.
Location:
  • City of Quincy
  • Construction Begins: Winter 2009/2010
    Construction Ends: Spring 2012
    Resident Engineer: Prasun (P.K.) Sen
    Construction Contract Value: $4,703,883.00
    Construction Bid Price: $5,075,947.37
    Initial Construction Estimate: $7,543,847.30
    Funding Provision: This project is planned to be funded through the 2010 Transportation Improvement Program for the Boston Metropolitan Planning Organization.
    MassHighway District: District 4

    Contracts (1) Progress
    # 62563 -- Construction Contract
    Roadway Reconstruction and Signal Improvements on Sections of Elm, Hancock, Mechanic & School Streets and Revere Road (Quincy Center Concourse) - Phase II) (ARRA)

    Bridges

  • - none -
  • Contract Dates
    Notice to Proceed: 03/18/2010
    Contract Information
    Project Designer: Municipality
    Funding Source: American Recovery & Reinvestment Act
    See the Milestone Details tab for additional Project information
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Construction
    no comments
    Accelerated Bridge Program
    no comments
    Planned Federal FY: 2010
    Responsible MPO: Boston Metropolitan Planning Organization
    Location: Municipality
    Cities: QUINCY
    Category: Advertised Projects Constr.
    Budget Section: 1C
    Advance Construct: No
    Air Quality Exempt: No

  • see #605968 for demolition
  • Category American Recovery & Reinvestment Act
    Federal Cost: $7,197,469.00
    State Cost: $0.00
    Total Cost: $7,197,469.00

    Project Task Information
    Project Status
    Project Review Committee Received 10/31/2005
    Project Review Committee PRC Approved 12/01/2005
    Project Review Committee Letter 12/19/2005
    Project Status Initiated 10/26/2005
    Project Status Advertised 01/23/2010
    Prj Scope & Negotiation
    Design
    Highway Design Process 25% Plans Received 11/01/2006
    Highway Design Process 25% Comments to DE 04/18/2007
    Highway Design Process Design Public Hearing 05/30/2007
    75% Design 75% Plans Received 05/27/2008
    75% Design 75% Comments to DE 02/05/2009
    100% Design 100% Plans Received 03/10/2009
    100% Design 100% Comments to DE 06/23/2009
    Final Design PS&E to CEPO 01/14/2010
    Final Design PS&E Received 11/03/2009
    Right of Way
    Requirements Requirements 02/06/2008
    Requirements Requirements 07/25/2008
    Traffic
    25% Design Review 25% Plans Received 07/31/2007
    25% Design Review 25% Plans Approved 03/30/2007
    75% Traffic Plans 75% Plans Received 06/20/2008
    75% Traffic Plans 75% Plans Approved 10/31/2008
    100% Traffic Plans 100% Plans Received 04/01/2009
    100% Traffic Plans 100% Plans Approved 06/19/2009
    Design Exceptions
    Regular Design Exception Approved 08/21/2008
    Regular Design Exception Submitted 08/19/2008
    Environmental
    Wetlands Protection Act Permit Issued 08/29/2008
    Wetlands Protection Act Permit Expires 08/29/2011
    ITS
    Utilities
    Non Participating