DOVER- NEEDHAM- BRIDGE REPLACEMENT, D-10-005=N-04-006, CHESTNUT STREET OVER THE CHARLES RIVER
This bridge was originally constructed in 1922 and reconstructed in 1977. It is now considered structurally deficient and a design to replace the bridge has recently been initiated. Details of the replacement bridge type and number of spans have not yet been identified.
|
| Location: |
|
| Design Responsibility: | Consultant |
| Right of Way Responsibility: | MassHighway |
| Construction Begins: | Spring 2015 |
| Project Manager: | Shahpar Negah![]() |
| Estimated Construction Cost: | $5,671,000.00 |
| MassHighway District: | District 4 |
| Current Status: | This project is in the preliminary design phase. |
|