MILTON- BRIDGE BETTERMENT, M-25-028, PONKAPOAG TRAIL OVER I-93/US-1
The work for the Ponkapoag Trail Bridge over I-93/US-1 shall consist of reconstructing the bridge and approach wearing surface; replacing the reinforced concrete deck slab and shear connectors; upgrading the bridge rail and protective screen; upgrading the approach guard rail; providing a new strip seal joint at abutments; providing a new approach slab; modifying the top of backwall for new joint; repairing the minor deteriorations at the abutments; and stripping and painting the structural steel.
Location:
  • Town of Milton
  • Construction Begins: Spring 2009
    Construction Ends: Summer 2010
    Resident Engineer: Anthony Neve, Sr.
    Construction Contract Value: $3,784,028.20
    Construction Bid Price: $3,152,524.00
    Initial Construction Estimate: $3,529,880.80
    MassHighway District: District 4
    Current Status: Installing rebar to the bridge decks. Forming abutment backwalls. (as of 10/21/2009)

    Contracts (2) Progress
    # 37070 -- Design -- Footprint Bridge contracts
    (Footprint 6) Perform design on deficient State and/or municipally owned bridges as part of the Bridge Rehabilitation/Replacement/Preservation Program. Final
    # 57758 -- Construction Contract
    Bridge Reconstruction (M-25-028) (Steel) - Ponkapoag Trail over I-93 and Route 1. 62% Complete

    Bridges

    Contract Dates
    Notice to Proceed: 04/06/2009
    Contract Information
    Project Designer: Consultant
    Funding Source: Non Federal Aid
    See the Milestone Details tab for additional Project information
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Construction
    Current Status
    Installing rebar to the bridge decks. Forming abutment backwalls.
    Accelerated Bridge Program
    no comments
    No TIP Data Available For This Project
    Project Task Information
    Project Status
    Project Need Form PNF Entered 05/21/2008
    Project Initiation Form PIF Entered 05/21/2008
    Project Initiation Form PRC Submitted 05/21/2008
    Project Status Advertised 10/18/2008
    Prj Scope & Negotiation
    Consultant Contract Process Scope to DE 02/17/2006
    Consultant Contract Process NTP Issued 03/27/2006
    Design
    75% 100% Plans Received 06/18/2008
    75% 100% Comments to DE 07/11/2008
    Subsurface Exploration PS&E to CEPO 10/07/2008
    Subsurface Exploration PS&E Received 09/29/2008
    Right of Way
    Plans Received 08/20/2008
    Traffic
    100% Traffic Plans 100% Plans Received 08/25/2008
    100% Traffic Plans 100% Plans Approved 09/25/2008
    100% TMP 100% Plans Received 08/25/2008
    100% TMP 100% Plans Approved 09/25/2008