Project Description:
SOMERVILLE- ASSEMBLY SQUARE ACCESS IMPROVEMENTS
The City of Somerville is proposing a series of transportation improvements to address vehicular access and public safety associated with new development opportunities planned within Assembly Square. These improvements include the following locations: • Assembly Square Drive. • Foley Street. • New Road. • Ikea Way. • G Street - A new roadway will be constructed between Mystic Avenue and Route 28. • Mt. Vernon Street/Lombardi Street at Broadway/ Mystic Avenue Southbound/ Assembly Square Drive (4 locations) - Signal upgrade and new signal installation at I-93 SB off-ramp u-turn. • Mystic Avenue Northbound at New Road - Signal upgrade. • Middlesex Avenue at Foley Street - Signal upgrade. • Route 28 at Assembly Square Drive - Intersection reconfiguration to allow left turns out of the site onto Route 28 SB. • Route 28 at Middlesex Avenue - Realigning site drive to form a "T" intersection. • Route 28 at Mystic Avenue Northbound Traffic Signal - Signal upgrade to improve visibility. • Kensington Avenue - Pedestrian crossing upgrade and signal installation.
Location:
  • City of Somerville
  • Design Responsibility: Municipality
    Right of Way Responsibility: Municipality
    Construction Begins: Spring 2010
    Project Manager: Manhar Patel
    Estimated Construction Cost: $15,615,275.00
    Funding Provision: This project is planned to be funded through the 2010 Transportation Improvement Program for the Boston Metropolitan Planning Organization.
    MassHighway District: District 4
    Current Status: This project has been advertised for construction bids. (as of 02/20/2010)

    Contracts (0) Progress
    No contracts associated with this project

    Bridges

  • - none -
  • See the Milestone Details tab for additional Project information
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Accelerated Bridge Program
    no comments
    Planned Federal FY: 2010
    Responsible MPO: Boston Metropolitan Planning Organization
    Location: Municipality
    Cities: SOMERVILLE
    Category: Advertised Projects Constr.
    Budget Section: 1
    Advance Construct: No
    Air Quality Exempt: No

  • UND = I cubed $
  • Category American Recovery & Reinvestment Act
    Federal Cost: $15,205,910.00
    State Cost: $0.00
    Total Cost: $15,205,910.00
    Category UNDETERMINED
    Federal Cost: $0.00
    State Cost: $13,000,000.00
    Total Cost: $13,000,000.00

    Project Task Information
    Project Status
    Project Need Form PNF Entered 04/10/2009
    Project Initiation Form PIF Entered 04/13/2009
    Project Initiation Form PRC Submitted 04/13/2009
    Project Review Committee PRC Approved 05/14/2009
    Project Review Committee Letter 05/14/2009
    Project Status Advertised 01/30/2010
    Project Status Advertised 02/20/2010
    Prj Scope & Negotiation
    Design
    Highway Design Process Design Public Hearing 07/23/2009
    75% Design 75% Plans Received 05/13/2009
    75% Design 75% Comments to DE 07/07/2009
    100% Design 100% Plans Received 08/28/2009
    100% Design 100% Comments to DE 11/02/2009
    Final Design PS&E to CEPO 01/22/2010
    Final Design PS&E Received 12/31/2009
    Right of Way
    Certification Issued 01/27/2010
    Plans Received 12/31/2009
    Requirements Requirements 06/29/2009
    Traffic
    75% Traffic Plans 75% Plans Received 05/11/2009
    75% Traffic Plans 75% Plans Approved 06/11/2009
    100% Traffic Plans 100% Plans Received 01/04/2010
    100% Traffic Plans 100% Plans Approved 02/02/2010
    Design Exceptions
    Environmental
    ITS
    Utilities
    Non Participating