| Project Description: |
CANTON- SAFE ROUTES TO SCHOOL (HANSEN SCHOOL)
The project includes reconstructing and widening existing sidewalks on Pecunit Street and Kenney Street, installing new sidewalk on Pecunit Street near Charles Drive, reconfiguring the existing school parking lot on Pecunit Street, installing wheel chair ramps, crosswalks and installing a flashing pedestrian warning assembly on Washington Street.
|
| Location: |
|
| Design Responsibility: | Consultant |
| Right of Way Responsibility: | Municipality |
| Construction Begins: | Winter 2010/2011 |
| Project Manager: | Azad Kidher![]() |
| Estimated Construction Cost: | $550,900.00 |
| MassHighway District: | District 4 |
| Current Status: | 75% Project Plans have been received. (as of 05/18/2010) |
|