BOSTON- TRAFFIC SIGNAL IMPROVEMENTS AT 18 LOCATIONS
This Boston project will upgrade twelve (12) traffic control signals and to install six (6) new signals (a total of 18 locations). Existing devices are outdated and require additional functionality to meet MUTCD standards. Some traffic signals will include communication cable and field equipment (local controllers, detectors, etc). Certain locations will be connected to the Boston Transportation Department central traffic computer system, which will allow remote monitoring and real time adjustments to timing. Sidewalk ramps will be reconstructed as needed in order to meet current AAB standards. All signals will be retimed based on current traffic volumes. Certain locations require minor geometric changes to improve safety and operations. The locations are Arlington Street at Beacon and Embankment Road; Arlington at Marlborough; Cambridge at North Harvard; Cambridge at Lincoln; Cambridge at Harvard and Franklin; Cambridge at Windom; Pleasant at Stoughton; Pleasant at Savin Hill; Waltham at Washington; Ceylon at Quincy; Dudley at Shirley; Cummins Highway at Rockdale; Cummins Highway at Woodhaven; Cummins Highway at Harvard; Washington at West Concord; Bennington at Brooks and Havre; Bennington at Marion and one additional location to be determined.
Location:
  • City of Boston
  • Design Responsibility: Municipality
    Right of Way Responsibility: Municipality
    Construction Begins: Spring 2014
    Project Manager: Brian Fallon
    Estimated Construction Cost: $3,367,500.00
    MassHighway District: District 4
    Current Status: This project is in the preliminary design phase.

    Contracts (0) Progress
    No contracts associated with this project

    Bridges

  • - none -
  • See the Milestone Details tab for additional Project information
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Accelerated Bridge Program
    no comments
    No TIP Data Available For This Project
    Project Task Information
    Project Status
    Project Need Form PNF Entered 03/18/2010
    Project Initiation Form PIF Entered 04/21/2010
    Project Initiation Form PRC Submitted 04/28/2010
    Project Review Committee PRC Approved 05/13/2010
    Project Review Committee Letter 06/08/2010