| Rehabilitation of Willimansett Bridge carrying Route 116 over the Connecticut River and Pioneer Valley Railroad in the cities of Chicopee and Holyoke. |
Final |
| Work will consist of providing engineering design and review services to MassHighway on an open end basis for various statewide highway and bridge projects. |
Final |
| Work will consist of structural evaluations and emergency design support services to support the Bridge Preservation/Betterment Advertisement Program. |
Final |
| Work will consist of reviewing Bridge Project estimates and preparing guidance for estimating of Bridge projects. |
Final |
| Work will consist of providing design and engineering services to MassHighway on a task order basis for various statewide Value Engineering Studies. |
Final |
| Work will consist of providing engineering design and review services to MassHighway on an open end basis for various highway and bridge projects. |
Final |
| Work will consist of providing engineering design and review services to MassHighway on an open end basis for various statewide highway and bridge projects. |
Final |
| Work will consist of providing engineering design and review services to MassDOT on a task order basis for various statewide highway and bridge projects. |
Final |
| Willimansett Bridge Deck Replacement and Related Work (Including Painting) (C-13-012-=H21-030) (Steel) – Route 116 (Cabot Street) over the Connecticut River and the Pioneer Va |
42% Complete |
| CHICOPEE-HOLYOKE CABOT STREET |
Final |