CANTON- DEDHAM- RANDOLPH- WESTWOOD- RECONSTRUCTION ON ROUTE 128 (I-93 ADD-A-LANE) FROM ROUTE 24 (RANDOLPH) TO EAST STREET ROTARY (WESTWOOD) (ROADWAY I) INCLUDES D-05-W31, M-25-030, R-01-010.
This contract consists of approximately 5 miles of I-95/93 (Route 128) roadway construction, beginning at Route 24 (Randolph) to the MBTA Franklin Rail Road Line bridge in Westwood, just north of the East Street Rotary. An additional 12-foot travel lane and 10-foot shoulder will be constructed toward the median in both directions. Construction will also consist of retaining walls, drainage improvements, culvert extensions, deck replacements, and noise barrier construction along Vincent Road in Westwood. This roadway contract will skip over the Canton/Dedham Bridge Contract (File No. 602288) involving the replacement of the Neponset River Bridge, AMTRAK/MBTA Bridge, and the University Avenue Bridge.
Location:
  • Town of Canton
  • Town of Dedham
  • Town of Randolph
  • Town of Westwood
  • Construction Begins: Summer 2008
    Construction Ends: Summer 2011
    Resident Engineer: Harry Thompson
    Construction Contract Value: $48,499,096.00
    Construction Bid Price: $41,984,651.00
    Initial Construction Estimate: $46,268,356.00
    Funding Provision: This project is planned to be funded through the 2010 Transportation Improvement Program for the Boston Metropolitan Planning Organization.
    MassHighway District: District 4
    Current Status: The Contractor has completed some RCP drainage crossings and continued CB Installs. Also prep work for single face barrier and drilled shaft work. (as of 08/02/2010)

    Contracts (4) Progress
    # 51302 -- Design -- Hwy Eng Open End
    Work will consist of providing engineering design and review services to the MassHighway on an open end basis for various statewide highway and bridge projects. Final
    # 53996 -- Design -- Services
    Work will consist of providing statewide photogrammetric services on an as need, assignment basis. Final
    # 54923 -- Construction Contract
    Randolph - Westwood - Roadway Reconstruction and Related Work on a Section of Interstate 95/93 (Rte 128) 37% Complete
    # 99068 -- Design -- Highway
    CANTON- RANDOLPH- ADD-A-LANE ROUTE 128( I-93) FROM ROUTE 24 RANDOLPH TO ROUTE I-95 CANTON Final

    Bridges

  • - none -
  • Contract Dates
    Notice to Proceed: 08/07/2008
    Contract Information
    Project Designer: Consultant
    Funding Source: NATIONAL HIGHWAY SYSTEM
    See the Milestone Details tab for additional Project information
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Construction
    Current Status
    The Contractor has completed some RCP drainage crossings and continued CB Installs. Also prep work for single face barrier and drilled shaft work.
    Accelerated Bridge Program
    no comments
    Planned Federal FY: 2010
    Responsible MPO: Boston Metropolitan Planning Organization
    Location: Municipality
    Cities: CANTON
    DEDHAM
    MILTON
    RANDOLPH
    WESTWOOD
    Category: Advertised Projects Constr.
    Budget Section: 1B
    Advance Construct: Yes
    Air Quality Exempt: No

    No comments for this TIP line
    Category NATIONAL HIGHWAY SYSTEM
    Federal Cost: $5,600,000.00
    State Cost: $1,400,000.00
    Total Cost: $7,000,000.00

    Planned Federal FY: 2011
    Responsible MPO: Boston Metropolitan Planning Organization
    Location: Municipality
    Cities: CANTON
    DEDHAM
    MILTON
    RANDOLPH
    WESTWOOD
    Category: Advertised Projects Constr.
    Budget Section: 1C
    Advance Construct: No
    Air Quality Exempt: No

    No comments for this TIP line
    Category NATIONAL HIGHWAY SYSTEM
    Federal Cost: $4,800,000.00
    State Cost: $1,200,000.00
    Total Cost: $6,000,000.00

    Planned Federal FY: 2012
    Responsible MPO: Boston Metropolitan Planning Organization
    Location: Municipality
    Cities: CANTON
    DEDHAM
    RANDOLPH
    WESTWOOD
    Category: Advertised Projects Constr.
    Budget Section: 1C
    Advance Construct: No
    Air Quality Exempt: No

    No comments for this TIP line
    Category NATIONAL HIGHWAY SYSTEM
    Federal Cost: $4,800,000.00
    State Cost: $1,200,000.00
    Total Cost: $6,000,000.00

    Project Task Information
    Project Status
    Project Review Committee PRC Approved 04/04/1975
    Project Status Advertised 09/22/2007
    Prj Scope & Negotiation
    Consultant Contract Process NTP Issued 04/23/2001
    Design
    Highway Design Process 25% Plans Received 12/18/2003
    Highway Design Process 25% Comments to DE 10/14/2004
    Highway Design Process Design Public Hearing 06/29/2005
    75% Design 75% Plans Received 03/06/2006
    75% Design 75% Comments to DE 10/04/2006
    100% Design 100% Plans Received 04/25/2007
    100% Design 100% Comments to DE 08/09/2007
    Final Design PS&E to CEPO 09/10/2007
    Final Design PS&E Received 08/22/2007
    Right of Way
    Requirements Requirements 10/26/2005
    Traffic
    75% Traffic Plans 75% Plans Received 06/11/2009
    75% Traffic Plans 75% Plans Approved 06/15/2009
    100% Design Review 100% Plans Received 04/30/2007
    100% Traffic Plans 100% Plans Received 04/30/2007
    100% Traffic Plans 100% Plans Approved 07/05/2007
    100% TMP 100% Plans Received 04/30/2007
    Design Exceptions
    Environmental
    Section 404 (ACOE) Permit Issued 09/12/2007
    Section 404 (ACOE) Permit Expires 01/20/2010
    ITS
    Utilities
    Non Participating